Similar Projects
Brentwood Boulevard Sewer and Water Main - 562-56392 - City of Brentwood
Infrastructure
Conception
$2,812,000 est. value
Brentwood, CA

Hollenbeck Pipe Improvements Project - City of Covina
Infrastructure
Conception
Covina, CA 91723

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

Repair a Damage Storm Drain System and Rebuild Nearby Eroded Embankment
Infrastructure
Design
$1,092,000 est. value
Half Moon Bay, CA 94019

Gordon Hill Road Pipeline Replacement Project
Infrastructure
Bidding
$2,600,000 est. value
Valley Center, CA 92082

Cathodic Protection for Transmission Pipelines at Various Locations, Phase 2
Infrastructure
Bidding
$3,900,000 est. value
Fremont, San Francisco, CA 94538

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Central Service Yard - Water Main Replacement - City Of San Jose
Infrastructure
Conception
San Jose, CA 95112

Lower Deadfall Meadows / Eddy Creek Trail Restoration
Renovation, Infrastructure
Design
$100,000 to $250,000 est. value
Mount Shasta, CA

Groundwater Remediation - Civic Center
Infrastructure
Bidding
$200,000 est. value
Cerritos, CA 90703

Trinidad Fire Station - Potable Waterline Installation or Connection
Infrastructure
Post-Bid
Trinidad, CA 95570

Water Leak Repair-Richmond
Alteration
Results
$400,000 est. value
Richmond, CA 94804

Reported 07/20/2022 09:24 AM
Project Title

$MUNI - CIP - RWCF Modify Project - UW16022 - City of Stockton

Physical Address View project details and contacts
City, State (County) Stockton, CA   (San Joaquin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023,
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Stockton, California. Conceptual plans call for site work for a water / sewer project. This project will implement certain projects contained in the Capital Improvement and Energy Management Plan (CIEMP) and those wastewater treatment facility improvements necessary to meet current National Pollution Discharge Elimination System treated wastewater discharge limits stipulated by the Regional Water Quality Control Board. Project is included City of Stockton FY 2023-2027 CIP Page 149 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents