Similar Projects
Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Lake Sana Development
New Construction
Conception
Westview, FL 33147

Parks and Recreation Department New Tampa Community Park Inclusive Playground Design-Build
Design
Less than $1,600,000 est. value
Tampa, FL

Newfield - Master Plan
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
Palm City, FL 34990

Jim Ward Community Center Playground Unit
Bidding
$275,000 est. value
Plantation, FL 33317

Development of Wellington Community Park
New Construction
Bidding
Wellington, FL 33414

Tennis Court Repair (Recreation and Aquatic Center)
Post-Bid
New Port Richey, FL 34652

Park Amenities
Post-Bid
Less than $1,014,099 est. value
Tampa, FL 33601

Julius Guinyard and Adjacent Park Improvement Project
Results
Less than $188,699 est. value
Jacksonville, FL 32202

Henry Lee Park Improvements
Results
$46,000 to $60,000 est. value
Daytona Beach, FL 32114

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

Five Park
New Construction
Construction
$345,000,000 est. value
Miami Beach, FL 33139

Myrtle Dreamers Academy
New Construction - 23,650 SF
Pending Verification
Sarasota, FL

Cassia Commons
New Construction - 633,600 SF
Conception
$10,000,000 CJ est. value
Lauderdale Lakes, FL 33311

Alexan Crafts
New Construction, Build-Out - 465,650 SF
Design
$10,000,000 CJ est. value
Coral Gables, FL 33134

Last Updated 09/11/2021 03:36 AM
Project Title

Winwood Park ADA Restroom Construction

Physical Address View project details and contacts
City, State (County) Altamonte Springs, FL 32701   (Seminole County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Park/Playground, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Winwood Restroom and sidewalk project will provide a newly constructed public restroom facility to be integrated with the park`s existing architecture and pedestrian paths. The restrooms will enhance the public`s use of the site by facilitating the nearby pavilion and sports facility. There is no change from the existing civic recreational use by the installation of this facility. The building consists of a men`s and women`s handicap accessible restroom accompanied by a supply room.

Details

Restroom/Bath House, Renovation, Park/Playground, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents