Similar Projects
Raritan River Bridge Replacement Construction Project Construction Contract No. 2
Renovation
Bidding

Raritan River Bridge Replacement Construction Project Construction Contract No. 2
Renovation
Bidding

Route 72 Manahawkin Bay Bridges, Contract 1A & 1B, Marsha Drive Intersection Improvements
Post-Bid
Trenton, NJ 08625

Priority Repairs to County Bridges, Clay Street, Bridge Street and Jackson Street Movable Bridges in East Newark Harrison and Newark
Renovation, Infrastructure
Post-Bid
Harrison, Newark, NJ 07029

Bridge Deck and Median Barrier Reconstruction Milepost 160.6 to 162.5
Results
$57,288,442 est. value
Fair Lawn, Paramus, Rochelle Park, Saddle Brook, NJ

Reconstruction of Bridge HL-18 on Kent Road Over the North Branch of Metedeconk River
Results
$2,212,012 est. value
Howell, NJ 07731

2021 Gloucester County Bridge Rehabilitation Project
New Construction, Infrastructure
Post-Bid
NJ

Replacement of County Bridge F1105 Liberty Corner Road (CR 512) Over Dead River
Results
$1,119,997 est. value
NJ

Rehabilitation of Jackson Road Bridge Over NJ Transit
Results
Berlin, NJ 08009

Replacement of County Bridge No. 1401-273 on Lamerson Road Over Tributary to Bamboo Brook
Results
Morristown, NJ 07963

Bridge Repairs and Resurfacing; Milepost 126 to 172 (2021)
Renovation
Results
Less than $6,618,255 est. value
Woodbridge, NJ

Replacement of Fair Lawn Avenue Bridge over Passaic River Structure No. 1600-009
Results
Paterson, NJ 07524

Reconstruction of Bridge MT-24 on CR 12A (Navesink River Road) over McClees Creek
Results
Middletown, NJ 07748

Replacement of Nacote Creek Bridge (PR-07) Old New York Road (CR-610) Over Nacote Creek
Results
Port Republic, NJ 08241

Replacement of County Bridge #364.15 Carrying Locust Lane Over Harry's Brook
Results
Princeton, NJ 08540

Last Updated 03/11/2022 02:47 AM
Project Title

Maintenance Orphan Bridge Repair Contract 2022-1

Physical Address View project details and contacts
City, State (County) State-Wide: NJ
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Principal Items Of Work Consist Of: Quantity Unit Description 3,952 Hour Labor Crew

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents