Similar Projects
West Henderson Parks And Recreation, Phases 2 - 5 - PR247 - City Of Henderson
New Construction, Infrastructure
Conception
$84,000,000 CJ est. value
Henderson, NV 89015

Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Tropical Speedway Distribution Center - Building A / North Las Vegas
New Construction, Infrastructure - 375,960 SF
Bidding
$10,000,000 CJ est. value
North Las Vegas, NV 89030

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

D/B Western MATOC
Results
$1,000,000 to $70,000,000 est. value

USPS JOC Nevada
New Construction
Results

Touro University Parking Expansion Phase II
New Construction
Construction
Henderson, NV 89014

Inspirada Marketplace
New Construction - 39,460 SF
Construction
$10,000,000 est. value
Henderson, NV 89009

Boulder Lodge Expansion
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$9,600,000 CJ est. value
Henderson, NV 89015

Dream Hotel Las Vegas
New Construction, Infrastructure - 27,000 SF
Pending Verification
$545,000,000 CJ est. value
Las Vegas, NV 89119

Charleston to Cheyenne Wideninig - Clark County
Infrastructure
Conception
$25,000,000 CJ est. value
Las Vegas, NV 89101

Last Updated 02/10/2023 10:24 AM
Project Title

Civic Center Building and Plaza

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89101   (Clark County)
Category(s) Entertainment/Recreation, Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Clubhouse/Social Club, Misc. Buildings, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $165,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Core construction | west requests applications for qualification from licensed subcontractors for the following project: city of las vegas civic center building and plaza 22.Mwa378.C1-jh in general, the phased projectconsists of existing structure demolition, site clearing, utility infrastructure and amenities, site improvements including shade structures, and a 240,000 +/- gsf concrete structure(s), wall panel and storefront systems, ornamental metals, metal framing and interior finishes, building specialties, mep systems and low voltage systems . To be eligible to provide labor, materials or equipment on this public work, each subcontractor must be qualified, pursuant to nrs 338.1699. Criteria for qualification include: (a) the monetary limit placed on the license of the applicant by the state contractors' board pursuant to nrs 624.220; (b) the financial ability of the applicant to provide the labor, materials or equipment required on the public work; (c) whether the applicant has the ability to obtain the necessary bonding for the work required by the public body; (d) the safety programs established and the safety records accumulated by the applicant; (e) whether the applicant has breached any contracts with a public body or person in this state or any other state during the 5 years immediately preceding the application; (f) whether the applicant has been disciplined or fined by the state contractors' board or another state or federal agency for conduct that relates to the ability of the applicant to perform the public work; (g)the performance history of the applicant concerning other recent, similar public or private contracts, if any,completed by the applicant in nevada; (h) the principal personnel of the applicant; (I) whether the applicant has been disqualified from the award of any contract pursuant to nrs 338.017 or 338.13895; and (j) the truthfulness and completeness of the application. This is a prevailing wage project: pwp number: cl-2022-338 core construction west is an equal opportunity employer, will not knowingly discriminate in any area of employment, and specifically encourages and invites all businesses to include womenowned, minority-owned, and disadvantaged business enterprise companies to participate in our qualification process.

Details

240,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents