Similar Projects
Adams Twp - Creslo Safe Routes to School Project
Bidding
$500,000 to $999,999 est. value
PA

US 30 Left Turn Lane at T-455
Bidding
$500,000 to $999,999 est. value
PA

Repave Main Park Road
Post-Bid
PA

2019 Capital Street Reconstruction
Post-Bid
Altoona, PA

Bituminous Pavement
Results
Hollidaysburg, PA

Spruce Street (T-459) Culvert Replacement
Results
Less than $150,000 est. value
Altoona, PA

SR 1011 - US 30 to US 30
Bidding
$2,500,000 to $4,999,999 est. value
PA

2019 C.D.B.G. Street Reconstruction Project
Post-Bid
Altoona, PA

US30 Breezewood Resurface
Results
$2,500,000 to $4,999,999 est. value

SR 2025 - PA 747 to US 522
Bidding
$500,000 to $999,999 est. value
PA

Broad St & Roosevelt Blvd Padot Paving Coordination Manhole Frames & Covers
Post-Bid
Johnstown, PA 15901

US 30 - US 219 to PA 985
Results
$2,500,000 to $4,999,999 est. value
PA

Edgewood Avenue to Byers Road
Bidding
$1,000,000 to $2,499,999 est. value
PA

Improvements to Washed out Road on State Game Lands
Post-Bid
PA

SR 14 Over Tributary to South Creek Flood RPR 2018
Results
$1,000,000 to $2,499,999 est. value
PA

Last Updated 01/18/2019 05:39 AM
Project Title

D9 2019 HSIP HFST

Physical Address View project details and contacts
City, State (County) (Bedford, Blair, Cambria, Fulton, Huntingdon, Somerset Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,499,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project consists of the placement of High Friction Surface Treatment in BEDFORD, BLAIR, CAMBRIA, FULTON, HUNTINGDON & SOMERSET COUNTIES, in VARIOUS TOWNSHIPS, COMMONWEALTH OF PENNSYLVANIA, on various state routes, as indicated in the approved drawings included in the Bid Package. 0608-0001 Lump Sum 1.000 01** n x Mobilization 0659-0001 Square Yard 90,107.000 01** n f4 High Friction Surface Treatment (Hfst) 0689-0003 Lump Sum 1.000 11 n x Cpm Schedule 0901-0001 Lump Sum 1.000 01** n q Std Maintenance And Protection Of Traffic During Construction 0901-0320 Linear Foot 136,500.000 01** n o 4" Standard Pavement Markings, Paint & Beads, Yellow 0901-0330 Linear Foot 136,500.000 01** n o 4" Standard Pavement Markings, Paint & Beads, White 0963-0004 Linear Foot 136,500.000 01** n o2, o3 4" Pavement Marking Removal 0963-0010 Each 18.000 05** n o2, o3 Pavement Marking Removal (Legends And Symbols) 0965-0160 Each 9.000 05** n o3 White Preformed Thermoplastic Legend, Slow Curve Arrow, Left (Includes Arrow, The Word Slow And 2 Transverse Bands) 0965-0161 Each 9.000 05** n o3 White Preformed Thermoplastic Legend, Slow Curve Arrow, Right (Includes Arrow, The Word Slow And 2 Transverse Bands)
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents