Similar Projects
Last Updated | 01/18/2019 05:39 AM |
Project Title | D9 2019 HSIP HFST |
Physical Address | View project details and contacts |
City, State (County) | (Bedford, Blair, Cambria, Fulton, Huntingdon, Somerset Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $2,499,999 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of the placement of High Friction Surface Treatment in BEDFORD, BLAIR, CAMBRIA, FULTON, HUNTINGDON & SOMERSET COUNTIES, in VARIOUS TOWNSHIPS, COMMONWEALTH OF PENNSYLVANIA, on various state routes, as indicated in the approved drawings included in the Bid Package. 0608-0001 Lump Sum 1.000 01** n x Mobilization 0659-0001 Square Yard 90,107.000 01** n f4 High Friction Surface Treatment (Hfst) 0689-0003 Lump Sum 1.000 11 n x Cpm Schedule 0901-0001 Lump Sum 1.000 01** n q Std Maintenance And Protection Of Traffic During Construction 0901-0320 Linear Foot 136,500.000 01** n o 4" Standard Pavement Markings, Paint & Beads, Yellow 0901-0330 Linear Foot 136,500.000 01** n o 4" Standard Pavement Markings, Paint & Beads, White 0963-0004 Linear Foot 136,500.000 01** n o2, o3 4" Pavement Marking Removal 0963-0010 Each 18.000 05** n o2, o3 Pavement Marking Removal (Legends And Symbols) 0965-0160 Each 9.000 05** n o3 White Preformed Thermoplastic Legend, Slow Curve Arrow, Left (Includes Arrow, The Word Slow And 2 Transverse Bands) 0965-0161 Each 9.000 05** n o3 White Preformed Thermoplastic Legend, Slow Curve Arrow, Right (Includes Arrow, The Word Slow And 2 Transverse Bands) | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |