Similar Projects
ADA Ramp Projects - CDBG Curb Ramps 2022
Infrastructure
Bidding
$600,000 est. value
Columbus, OH

2022 Street Maintenance Program and Groveport Municipal Golf Course Cart Path Replacement Project
Infrastructure
Bidding
$1,433,300 est. value
Groveport, OH

Pedestrian Safety Improvements - Chantry Drive Sidewalk
Infrastructure
Post-Bid
Columbus, OH 43232

Cultural Arts Center Parking Lot Repair
Infrastructure
Post-Bid
Columbus, OH 43215

UIRF 2016 Sidewalks P2
Results
Less than $1,707,075 est. value
Columbus, OH

Grandview Heights Signals Interconnect
Results
Less than $1,156,318 est. value
Grandview Heights, OH 43212

Paving Improvement
Infrastructure
Post-Bid
Hilliard, OH 43026

Quarry Trails Overlook Deck and Parking Area
Results
Less than $400,000 est. value
Columbus, OH

2022 Sidewalk Maintenance
Infrastructure
Post-Bid
Upper Arlington, OH

Miscellaneous Developments- American Addition Infrastructure Phase 4
Results
Columbus, OH

Celebrate 1 Sidewalk - Hamilton Avenue
Results
Columbus, OH

Celebrate 1 Sidewalk - Hilltop Belvidere Mound to Sullivant
Results
Columbus, OH

Reflective Rapid Flashing Beacon
Results
Worthington, OH

Block L Infrastructure and South of Goodale Infrastructure Improvements
Results
Less than $10,054,235 est. value
Grandview Heights, OH

Comprehensive Wayfinding System Phase 2
Results
Less than $640,000 est. value
Dublin, OH

Last Updated 05/10/2022 05:11 AM
Project Title

Pedestrian Safety - Walford Street, Sharbot Drive, and North

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves constructing sidewalks to fill gaps within the pedestrian network. Project limits are generally where gaps exist along Walford Street from Belcher Drive to Morse Road, along Sharbot Drive from approximately 350’ west of Carahan Road to Heaton Road, and along Northtowne Boulevard from Morse Road to Jonathon Court. Installation of the sidewalk will include curb ramps and drive approaches. Stormwater quantity and quality will be required, and other such work

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents