Similar Projects
Chippewa Mall Drive Extension
Infrastructure
Bidding
$340,000 est. value
Chippewa Falls, WI 54729

190th Street, CTH X to 70th Avenue Town Road Improvement Discretionary Program (TRID)
Infrastructure
Bidding
$310,000 est. value
WI

2021 LRIP Road Improvements
Post-Bid
New Auburn, WI 54757

Lift to Road
Infrastructure
Post-Bid
Bloomer, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

C. Chippewa Falls, Seymour Cray SR Blvd., CTH I Intersection
Results
Chippewa Falls, Seymour, WI

Culvert Installation
Infrastructure
Post-Bid
WI 54724

Spring and River Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Road Work
Infrastructure
Post-Bid
Bloomer, WI 54724

Cedar Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Crack Sealing
Infrastructure
Post-Bid
Bloomer, WI 54724

Bridgewater Avenue Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Blacktop
Infrastructure
Post-Bid
Holcombe, WI

Irvine Street and Summit Avenue Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Roadwork
Infrastructure
Post-Bid
Bloomer, WI

Reported 07/09/2022 12:00 AM
Project Title

120th Chip Seal

Physical Address View project details and contacts
City, State (County) Chippewa Falls, WI   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $13,000 to $18,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

120th Avenue & 70th Street Wide Crack Fill and Chip Seal Bid Requests Town of Tilden, Chippewa County is requesting Wide Crack Filling and Chip Sealing bids for 120th Ave. from Chippewa County Hwy. F heading west to 70th Street, south on 70th Street to town termination, an approximate distance of 5,312 feet. Wide Crack Filling will be done according to the Town of Tilden requirements to be followed with Chip Sealing the roadway using hot oil and 5/16 fractured granite chips.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents