Similar Projects
Amazon Logistics Distribution Center - Unit 5 (Last Mile Delivery Center)
Renovation - 87,000 SF
Conception
South Lyon, MI 48393

Redwood Living - Portage - Rental Home Community
New Construction
Conception
Portage, MI 49002

Beyond Self Storage
New Construction, Demolition
Design
Farmington Hills, MI 48334

Bearing Service Warehouse
New Construction, Addition - 5,227 SF
Design
$400,000 est. value
Warren, MI 48091

Storage Shed at Fire Station 2
New Construction
Bidding
Dearborn, MI 48124

Fabric Membrane Structure
New Construction
Bidding
MI

Cold Storage Building
New Construction - 4,000 SF
Post-Bid
Sandusky, MI

Public Storage - Climate Controlled Warehouse
New Construction - 33,274 SF
Post-Bid
Waterford, MI 48328

DPW Storage Building Project
Results
Less than $564,138 est. value
Saint Clair Shores, MI

New Vehicle Maintenance Facility - Building Fit Out
Results
Mount Clemens, MI

National Storage Centers - Building D
New Construction - 17,217 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Comstock Park, MI 49321

Costco Warehouse and Fuel Station
New Construction - 157,453 SF
Construction
$15,362,894 est. value
Midland, MI 48642

Octapharma Plasma - Expansion
New Construction - 805 SF
Pending Verification
Less than $500,000 CJ est. value
Ypsilanti, MI 48197

Self-Storage Facility
Renovation - 48,000 SF
Pending Verification
Williamsburg, MI 49690

Pronto Freight Ways - Addition
Addition - 16,500 SF
Conception
Taylor, MI 48180

Last Updated 07/13/2021 10:23 AM
Project Title

Schafer Industrial Commons: Warehouse and Speculative Warehouse Units

Physical Address View project details and contacts
City, State (County) Romeo, MI   (Macomb County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Obtained from a Public Office
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project has 2 multi-tenant buildings

Details

,, 43,492 SF - Warehouse/Storage, 21,746 SF New Construction, Warehouse/Storage, 21,746 SF New Construction, 98 Parking Spaces, 1.31 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents