Similar Projects
Lindon City Culinary Waterline Replacement Project - Geneva Road
Post-Bid
Lindon, UT

Atmospheric Monitoring Replacement Program
Post-Bid
Less than $225,000 est. value
Salt Lake City, UT

DBB Replace POL Pump House Hill AFB Utah
Results
$10,000,000 to $25,000,000 est. value
Ogden, UT 84056

Mabey Pond Water Supply Improvement Project
Results
Less than $310,000 est. value
Clearfield, UT

Sand Hollow Regional Pipeline Alignment Preparation Project
Construction
Saint George, UT

Laketown Water Improvements Project
Construction
Laketown, UT

Solicitation to Obtain Water Treatment Service at Salt Lake City Air Route Traffic Control Center
Post-Bid
Salt Lake City, UT 84116

MP-12D - 700 South Pump Station
Results
Less than $17,200,000 est. value
Salt Lake City, UT

100 South Waterline Replacements
Post-Bid
Centerville, UT

DFCM Construction - DOC USCF Off-Site Infrastructure Improvements
Results
Less than $70,000,000 est. value
Salt Lake City, UT

Construction of JVWCD Retail Area Takeover Design
Post-Bid
Midvale, UT

Little Valley Pump Station Reconstruction
Results
Saint George, UT

Water Meter Replacement Project
Post-Bid
Springdale, UT

Culinary Water System Improvements in 2019
Results
Less than $2,000,000 est. value
Garden City, UT

Underground Pressurized Irrigation
Post-Bid
Bountiful, UT

Last Updated 01/31/2019 06:06 PM
Project Title

Otts Canyon Livestock Pipeline

Physical Address View project details and contacts
City, State (County) Vernon, UT   (Tooele County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Provide: materials purchased and installation of two spring developments, livestock pipeline, two solar pumping stations, and seven watering facilities to specifications described in the Engineering design. This task order includes the Contractor to furnish labor, equipment, supervision, transportation, operating supplies and incidentals. Project area totals approximately two miles of pipeline.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents