Similar Projects
Alturas Water System Improvement & Cabin Creek Drainage Restoration Project On The Sawtooth National Forest
Term Contract
Design
$250,000 to $500,000 est. value
Stanley, ID 83278

Gaoa - Salmon River Road Corridor Rec. Site Maintenance (Surface Rock) 4Cn
Term Contract
Design
$100,000 to $250,000 est. value
ID

Pipe and Guardrail Replacement
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

Pipe and Guardrail Replacement
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

Hydrated Lime for Bunker Hill Central Treatment Plant
Infrastructure
Post-Bid
Kellogg, ID 83837

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

Wildlife Overpass at Cervidae Peak, MP
Term Contract
Bidding
$3,000,000 to $5,000,000 est. value
Boise, ID 83716

Buhl and Filer Highway Districts 2021 Crushing Project
Infrastructure
Post-Bid
ID

Bunker Hill Central Treatment Plant
Alteration
Results
Kellogg, ID 83837

Molenaar Park Splash Pad Utilities
New Construction, Alteration
Bidding
Boise, ID

Bids for Crushing Gravel
Infrastructure
Post-Bid
Jerome, ID 83338

Constructing a Stiff Leg Culvert on SH-21 MP 123
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
ID

Road Salt
Term Contract
Post-Bid
Idaho Falls, ID 83401

Reported 03/02/2022 12:00 AM
Project Title

Desmet Road Pedestrian Trail Project

Physical Address View project details and contacts
City, State (County) Plummer, ID   (Benewah County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Base Bid includes construction of a pedestrian trail with approximately 450 cubic yards of gravel borrow, 440 square yards of asphalt pavement, 600 linear feet of curb and gutter, 270 square yards of concrete sideway, 185 square yards of replacement driveways and approaches, roadside drainage improvements, erosion and sediment control, temporary traffic control and related miscellaneous work. Bid Alternate A includes construction of a box culvert extension and asphalt paved pedestrian trail with approximately 200 cubic yards of gravel borrow, 75 square yards of asphalt pavement, cleaning debris from the existing box culvert, 40 linear feet of handrail, 27 cubic yards of rip rap, roadside drainage improvements, dewatering, erosion and sediment control, temporary traffic control and related miscellaneous work. Bid Alternate B includes construction of a precast concrete pedestrian bridge and asphalt paved pedestrian trail with approximately 160 cubic yards of gravel borrow, 60 square yards of asphalt pavement, roadside drainage improvements, dewatering, erosion and sediment control, temporary traffic control and related miscellaneous work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents