Similar Projects
Air Park Recreation Center Replacement Facility - City of Lincoln
Addition, Infrastructure
Conception
$933,182 CJ est. value
Lincoln, NE 68524

Multi Modal Center - City of Lincoln
New Construction, Infrastructure
Conception
$528,979 CJ est. value
Lincoln, NE 68508

Compressed Natural Gas (CNG) Fueling Station
New Construction, Infrastructure
Design
$4,481,919 CJ est. value
Lincoln, NE 68508

Monolith Materials Anhydrous Ammonia Plant - Phase 2
Addition, Demolition, Renovation, Infrastructure
Design
$1,000,000,000 CJ est. value
Hallam, NE 68368

Arnold Heights Concrete - 2022
Infrastructure
Post-Bid
$30,000 CJ est. value
Lincoln, NE 68508

Southeast Community College Healing Gardens Lincoln Campus
Infrastructure
Post-Bid
$200,000 CJ est. value
Lincoln, NE 68508

MSC Site Improvement
Infrastructure
Results
$600,000 est. value
Lincoln, NE

Reception and Treatment Center Exterior Repairs - Phase II
Addition, Demolition, Renovation, Infrastructure
Results
$1,373,246 CJ est. value
Lincoln, NE 68510

Southeast Community College Residence Hall - Lincoln Campus
New Construction, Infrastructure - 89,780 SF
Construction
$25,000,000 CJ est. value
Lincoln, NE 68520

Sandhills Global Youth Complex project - BP1 (site grading)
New Construction, Infrastructure
Construction
$27,000,000 CJ est. value
Lincoln, NE 68508

South 59th Circle Mixed-Use / Lincoln
New Construction, Infrastructure - 130,000 SF
Pending Verification
$60,000,000 CJ est. value
Lincoln, NE 68516

17th & Holdrege Transformer #2 - SUB410 - City of Lincoln
New Construction, Infrastructure
Pending Verification
$3,204,000 CJ est. value
Lincoln, NE 68508

20th & Pioneers Substation Replace Transformer - 0693 - City of Lincoln
New Construction, Infrastructure
Conception
$1,064,000 CJ est. value
Lincoln, NE 68502

New Central Library - City of Lincoln
New Construction, Infrastructure
Design
$45,000,000 CJ est. value
Lincoln, NE 68508

University of Nebraska-Lincoln - Architecture Complex - Phase 2 - Mass Timber Package
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$11,393,000 CJ est. value
Lincoln, NE 68508

Last Updated 10/16/2023 09:47 PM
Project Title

Reception and Treatment Center Phase Three - 96 Bed Addition

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68522   (Lancaster County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

General contract for the new 96 Bed Addition at the existing RTC (Rehabilitation & Treatment Center) - in Lincoln. Bid Security shall be in the amount of five percent (5%) of the amount of the bid and shall be in the form of a Bid Bond executed by the Bidder. In lieu of Bid Bond, bidders may submit Bid Security in the form of cash, certified check, cashier's check, money order or bank draft payable to the Owner as represented on the first page of this document. Bids must be on a Lump Sum basis and shall be in accord with the Instructions to Bidders. A bid bond executed by a duly authorized surety and in appropriate form may be submitted in lieu of the deposit of money or certified check. All deposits of money, certified checks or bid bonds must be submitted in separate sealed envelopes plainly identified. The deposit money, certified check or bid bond will be held as surety as to assure that the bidder will enter into a contract and furnish the required performance and payment bonds. The bid security should be made payable to Nebraska Department of Correctional Services. The deposit money, certified checks or bids bonds of the unsuccessful bidders shall be returned as soon as the successful bidder is determined. The deposit of money, certified check or bid bond of the successful bidder shall be returned upon the execution of the contract documents. Questions and substitution requests must be submitted in writing and received by the Architect, CARLSON WEST POVONDRA ARCHITECTS no later than October 6, 2023. Items received after this date may not be considered. The Owner reserves the right to reject any or all Bids and to waive informalities or irregularities in the bidding.

Details

Addition, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents