Similar Projects
Carrington Hall Renewal
Renovation
Conception
Chapel Hill, NC 27514

Inflow & Infiltration (I&I) FY25-26 - SR-II-25 - City of Jacksonville
Infrastructure
Conception
$585,000 est. value
Jacksonville, NC

Renovations to the Don Ellis Building
New Construction, Renovation - 7,000 SF
Design
Less than $1,000,000 est. value
Raleigh, NC 27616

Northern Regional Pump Stations and Force Mains, Phase A
Infrastructure
Design
$817,675 CJ est. value
Wilmington, NC 28406

Johnston County Timothy G. Broome (Tgb) Water Treatment Plant (Wtp) Expansion Design-build Services
Addition, Demolition, Infrastructure
Bidding
$55,200,000 CJ est. value
Smithfield, NC 27577

Trenchless Installation of 24" Steel Pipe
Infrastructure
Bidding
$600,000 CJ est. value
Troy, NC 27371

Simon Bright Building Demolition
Demolition, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Kinston, NC 28501

Grounds Maintenance Services
Term Contract
Sub-Bidding
Weldon, NC 27890

UNCSA - New Residence Hall
New Construction - 129,999 SF
Post-Bid
Less than $46,000,000 est. value
Winston-Salem, NC 27127

Asbury Chapel Farmhouse Cluster
Post-Bid
Huntersville, NC 28078

Runway 23L Approach Clearing Project
Results
Greensboro, NC 27400

Kenan Flagler Business School Addition and Renovation
Renovation, Addition - 550,000 SF
Results
Less than $115,885,000 est. value
Chapel Hill, NC 27599

Livingstone College F. George Shipman Science Center
Addition - 14,106 SF
Construction
Salisbury, NC 28144

Lyons Science Center Comprehensive Renovation
Renovation
Construction
Fayetteville, NC 28301

Additions and Renovations at Newton Conover High School
Addition, Renovation, Infrastructure
Pending Verification
$20,800,000 CJ est. value
Newton, NC 28658

Last Updated 07/29/2022 12:06 PM
Project Title

Southwestern Community College - Burn Building Soil boring

Physical Address View project details and contacts
City, State (County) Sylva, NC 28779   (Jackson County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Southwestern Community College - Burn Building Soil boring General Requirements: 1. Perform soil borings in accordance with ASTM D-1586 and document findings with detailed soil boring logs. Perform borings in the general locations specified by Architect. a. For sites where approximate final grades are known, perform detailed soil boring logs to a depth of at least 15' below proposed building FFE and 5' feet below utility excavations and design grade. 2. Determine and document seasonal high water table elevations at boring locations. 3. Detailed Boring Logs and Soil Profiles including: a. Approx. ground elevation b. Depth of topsoil c. Sample and soil horizon depths and elevations d. Soil descriptions (including USCS classifications) e. Groundwater levels at the time of boring and at 24-hours f. Standard penetration (N) values 4. Soil boring map keyed to the soil boring log. 5. Laboratory test results of Atterberg limits, natural moisture content and California Bearing Test (CBR). 6. Standard proctor test results. 7. Site and regional geography description. 8. Opinion of on-site soil suitability for fill. 9. Recommended site preparation. 10. Recommendation procedures for soil and rock excavations. 11. Fill placement, compaction and moisture content recommendations 12. Discussion of site conditions which could result in construction delays or additional costs. 13. Slope stability recommendations. 14. Building foundation and floor slab recommendations. 15. Soil bearing capacities. 16. Settlement potential. 17. Asphalt and concrete pavement design recommendations. 18. Opinion of rock and unsuitable soil quantities to be excavated for proposed construction. 19. Review of site earthwork specifications.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents