Similar Projects
Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Middlefield Park Masterplan
New Construction, Demolition - 1,467,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA 94043

The Seminary at Strawberry
New Construction
Design
Mill Valley, CA 94941

Warner Center Life Plan Community - Woodland Hills
New Construction - 758,835 SF
Design
$10,000,000 CJ est. value
Los Angeles, CA 91367

Neighborhood Park Renovations: Sundowner and Vintage Parks
Renovation
Bidding
$950,000 est. value
Lake Forest, CA 92630

Holly Mini Park
Renovation
Bidding
$545,000 est. value
Oakland, CA 94603

Park: All Inclusive Playground - Emma Prusch
New Construction
Post-Bid
$2,250,001 to $2,750,000 est. value
San Jose, CA

Hatch Preschool Playground Project
New Construction
Post-Bid
Half Moon Bay, CA 94019

Tahoe Park Pool Restroom Renovation
Renovation, Infrastructure
Results
$220,570 est. value
Sacramento, CA 95820

Creekside and Meadowbrook Group Area Renovation at Vasona Lake County Park
Renovation
Results
$924,206 est. value
Los Gatos, CA 95032

The Landing at Arroyo and Vintage at Sycamore
New Construction
Construction
$114,000,000 est. value
Simi Valley, CA 93065

Traditions at the Meadow Subdivision
New Construction - 7,500 SF
Pending Verification
$1,000,000 est. value
Martinez, CA 94553

Mixed-Use Residential Village
New Construction
Pending Verification
San Jose, CA 95131

The Creek at Dominguez Hills
New Construction - 199,000 SF
Conception
$10,000,000 CJ est. value
Carson, CA 90746

Icon/Echo Towers
New Construction, Demolition - 478,500 SF
Design
$600,000,000 est. value
San Jose, CA 95113

Reported 02/24/2022 12:00 AM
Project Title

Community Garden at Floyd Farms

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95818   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under these Special Provisions consists of developing a community garden at Floyd Elementary School in Sacramento at 401 McClatchy Way. The improvements will consist of developing a new City managed 0.4-acre Community Garden. The work includes a temporary construction fence, erosion control grading, drainage, a new water tap, backflow preventer, 6’ chain link fencing, 12’ double tubular steel gates, 6’ pedestrian tube steel gate, entry sign, , and a hose bid irrigation system for the new Community Garden, raised concrete curbs and concrete header, concrete flatwork and concrete pads, stabilized decomposed granite paving, import garden soil, a 10’ x 12’ tuff Shed, compost bids, and benches. The new work in the existing Urban Farm consists of installing a new quick coupler irrigation system, which will be connected to the existing Urban Farm irrigation mainline. The Estimated Construction Cost,$483,113.00 base bid, $571,234.00.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents