Similar Projects
Tempe Campus Student Housing Renovations
Renovation
Conception
Tempe, AZ 85281

Tempe Campus Core Support Research Facility
New Construction
Conception
Tempe, AZ 85281

Design-Build Services
New Construction - 150,000 SF
Design
Tucson, AZ

Contractor 2022 Simplified Construction Program
New Construction
Bidding
Less than $100,000 est. value
Tempe, AZ

Construction Manager at Risk (CMAR) for the Science Wing Project
New Construction - 9,700 SF
Bidding
$36,000,000 est. value
Tsaile, AZ

Construction Manager at Risk Services Relating to the University of Arizona`s Andrew Weil Center for Integrative Medicine
New Construction - 34,000 SF
Post-Bid
Tucson, AZ 85721

Capla Addition and Renovation
Renovation, Addition
Post-Bid
$1,400,000 est. value
Tucson, AZ 85721

Construction Manager at Risk (CMAR) Services - Life Science / Physical Science Remodel and Building Additions - South Mountain Community College
Renovation, Addition
Results
$11,500,000 est. value
Phoenix, AZ 85040

NAU Science Annex 1st. and 2nd. Floor Renovation
Results
$5,335,406 est. value
Flagstaff, AZ 86011

Applied Research Building
New Construction - 60,000 SF
Construction
Less than $33,000,000 est. value
Phoenix, AZ

University of Arizona Health Sciences Sleep Research Center
Renovation - 10,500 SF
Construction
Tucson, AZ 85721

West Campus Student Housing Academic/Office Space
New Construction
Conception
Glendale, AZ 85306

Pre-Engineered Shade Structures
Post-Bid
AZ

Tempe New Academic Building
New Construction - 143,000 SF
Results
Less than $58,000,000 est. value
Tempe, AZ

Notre Dame Prep Performing Arts Theater f/k/a/ St. Catherine of Bologna Performing Arts Center
New Construction - 19,672 SF
Construction
$6,800,000 est. value
Scottsdale, AZ 85260

Reported 05/27/2022 12:00 AM
Project Title

Job Order Contract (General Construction, Electrical, Mechanical, Civil/Utility, Building Automation)

Physical Address View project details and contacts
City, State (County) Tucson, AZ   (Pima County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This is a service / maintenance or supply contract in Tucson, Arizona. Contact the soliciting agency for additional information. For selection as a University of Arizona designated Job Order Contractor. This solicitation will use the methodology prescribed by Section 3-804.B.6 of the University Procurement Code and the University intends to award multiple Job Order Contracts for each class of work. For the furnishing of all labor, materials, transportation and services required for General Construction, Electrical, Mechanical, Civil/Utility and Building Automation work on Construction Projects (less than $1,999,999.00 in construction cost) to be done under Job Order Contracts on the campus of the University of Arizona and other University of Arizona sites located within the State. The Owner anticipates awarding a minimum of three Job Order Contracts for each of the following: General Construction, Electrical, Mechanical, Civil/Utility and Building Automation. Potential Offerors are advised that the Owner does not guarantee that any minimum amount of work will be authorized under any contract resulting from this solicitation, and the Owner fully reserves its right to construct its construction projects in whatever manner is deemed most advantageous to the Owner. A certified or cashier's check or a Proposal Bond for $5,000 must accompany each Price Proposal, as a guarantee that the Contractor will enter into a contract to perform the work in accordance with the Request for Proposal Documents or as liquidated damages in the event of failure or refusal of the Contractor to enter into the contract, which check or bond will be returned to the unsuccessful Offerors, and to successful Offerors upon the execution of a satisfactory bond and contract, as prescribed by Arizona Revised Statutes. The successful Offerors, after receiving a Notice of Intent to Award, shall furnish to the aforesaid Board of Regents a written commitment to furnish satisfactory performance and payment bonds for each individual project, each in an amount equal to one hundred percent (100%) of the full amount of the work order. These bonds are not to be expressly limited as to time in which action may be instituted against the surety company for possible non-performance of the Contractor. Work on each Project shall commence in accordance with a Work Order and Notice to Proceed issued by the Owner and shall be completed within the time period stated in the Work Order and Notice to Proceed. The Board reserves the right to reject any or all proposals, to waive or decline to waive irregularities in any proposal, or to withhold the award for any reason it may determine and also reserves the right to hold any or all proposals for a period of ninety (90) days after the date of the opening thereof. No Offeror may withdraw his proposal during this ninety (90) day period. All correspondence relating to this solicitation should be directed to: Lorna Gray Director, Construction Department of Planning, Design & Construction University of Arizona 220 West Sixth Street Third Floor Tucson, Arizona 85701 Phone: 520.621.9372 Email: Lornagray@arizona.edu ARIZONA BOARD OF REGENTS By: Ralph Banks, P.E., P. Eng. CEM, LEED AP Executive Director, Engineering Design & Construction Department of Planning, Design & Construction.

Details

College/University, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents