Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

TSG Senior Apartments
New Construction, Infrastructure - 300,000 SF
Post-Bid
Golden Valley, MN 55422

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Grading, Bituminous Surfacing, ADA Improvements and Signal
Results
MN

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

P143 Intelligence Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 9,200 SF
Post-Bid
$15,000,000 CJ est. value
Minneapolis, MN 55450

2021 Street Surface Improvements
Results
$500,000 est. value
Hopkins, MN

Bde Maka Ska Refectory
New Construction, Infrastructure - 9,890 SF
Construction
$6,225,700 CJ est. value
Minneapolis, MN 55408

Seven Points Uptown
New Construction, Infrastructure, Renovation - 172,000 SF
Pending Verification
$150,000,000 CJ est. value
Minneapolis, MN 55408

Walgreens #16279 / Minneapolis
New Construction, Infrastructure - 75,000 SF
Post-Bid
$20,000,000 CJ est. value
Minneapolis, MN 55406

Grading, Bituminous Mill and Surfacing, UTBWC, ADA Improvements
Infrastructure
Results
MN

County Road 47 Reconstruction Phase 1
Infrastructure
Construction
$5,909,352 CJ est. value
Plymouth, MN 55446

Last Updated 06/16/2023 09:15 AM
Project Title

2023 Pavement Rehabilitation Gleason Lake Elementary School and District Office

Physical Address View project details and contacts
City, State (County) Plymouth, MN 55447   (Hennepin County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $295,865 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Install erosion control devices prior to beginning construction activities. Remove and dispose of existing parking signs where shown on the Drawings. Repair two existing catch basin structures and adjacent concrete curb and gutter as shown. Sawcut and remove existing concrete curb and gutter and concrete sidewalks where shown. Reclaim existing bituminous pavement and underlying soils to a depth of 10 inches. Grade and compact reclaimed bituminous/aggregate base material to accommodate new bituminous pavement section, allow for positive surface drainage, and maximize reuse of reclaimed material on-site. Schedule and perform proof-roll of prepared base in the presence of the Engineer. Where required by Engineer, perform subgrade corrections by excavating existing soils and replacing with reclaimed bituminous/aggregate base. Remove excess reclaimed material from the site. Construct new concrete curb and gutter systems, pedestrian curb ramps, and sidewalks as shown. Place new bituminous pavement over prepared base. Install new signposts and parking signs. Stipe parking lots, drives, and curbing as shown. Place topsoil, seed, and temporary erosion control blanket in disturbed lawn areas. Remove erosion control devices following final site stabilization. Site Directions: Gleason Lake Elementary School and District Office, 310 County Road 101 North, Plymouth, Minnesota Direct communications regarding this Project to Brent Boelter, Inspec, telephone 763-546-3434; bboelter@inspec.com Question Deadline 05/25/2023 A. Coordinate all work and schedule with Owner and Owneris separate onsite Contractors. B. Install erosion control devices prior to beginning construction activities. C. Remove and dispose of existing parking signs where shown on the Drawings. D. Repair two existing catch basin structures and adjacent concrete curb and gutter as shown. E. Sawcut and remove existing concrete curb and gutter and concrete sidewalks where shown. F. Reclaim existing bituminous pavement and underlying soils to a depth of 10 inches. G. Grade and compact reclaimed bituminous/aggregate base material to accommodate new bituminous pavement section, allow for positive surface drainage, and maximize reuse of reclaimed material on-site. H. Schedule and perform proof-roll of prepared base in the presence of the Engineer. 1. Where required by Engineer, perform subgrade corrections by excavating existing soils and replacing with reclaimed bituminous/aggregate base. 2. Remove excess reclaimed material from the site. I. Construct new concrete curb and gutter systems, pedestrian curb ramps, and sidewalks as shown. J. Place new bituminous pavement over prepared base. K. Install new signposts and parking signs. L. Stipe parking lots, drives, and curbing as shown. M. Place topsoil, seed, and temporary erosion control blanket in disturbed lawn areas. N. Remove erosion control devices following final site stabilization. O. The following quantity should be bid as specified. If the quantity increases or decreases during the construction process, the unit price provided will be used to adjust the Contract amount: 1. Subgrade corrections (compacted volume): 300 cubic yards

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents