Similar Projects
Garfield/22nd Bridge Improvement - City Of Decatur
Infrastructure
Conception
$1,100,000 CJ est. value
Decatur, IL 62526

Garfield/22nd Bridge Improvement - City Of Decatur
Infrastructure
Conception
$1,100,000 CJ est. value
Decatur, IL 62526

Millikin University Student-Athlete Facility
New Construction, Infrastructure, Renovation - 10,870 SF
Design
$6,700,000 CJ est. value
Decatur, IL 62522

Millikin University Student-Athlete Facility
New Construction, Infrastructure, Renovation - 10,870 SF
Design
$6,700,000 CJ est. value
Decatur, IL 62522

2023 Local Motor Fuel Tax Street Improvement Project
Infrastructure
Bidding
$200,000 CJ est. value
Decatur, IL 62523

2023 Local Motor Fuel Tax Street Improvement Project
Infrastructure
Bidding
$200,000 CJ est. value
Decatur, IL 62523

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Valve and Hydrant Replacement
Infrastructure
Results
$480,988 est. value
Decatur, IL

2022 Valve and Hydrant Replacement
Infrastructure
Results
$480,988 est. value
Decatur, IL

A-O Grade School Pavement Rehabilitation
Infrastructure
Construction
$333,852 CJ est. value
Oreana, IL 62554

A-O Grade School Pavement Rehabilitation
Infrastructure
Construction
$333,852 CJ est. value
Oreana, IL 62554

Archer Daniels Midland Company Protein Processing Plant Expansion
New Construction, Infrastructure
Pending Verification
$300,000,000 CJ est. value
Decatur, IL 62526

HSHS St. Mary's Hospital Renovation
Addition, Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Decatur, IL 62521

Decatur Raw Water Pipeline From Sludge Lagoon - City of Decatur
Infrastructure
Conception
$960,000 CJ est. value
Decatur, IL 62523

Last Updated 08/11/2023 11:29 AM
Project Title

Patching, Pipe underdrain replacement and resurfacing on US 51

Physical Address View project details and contacts
City, State (County) Decatur, IL 62526   (Macon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $24,477,448 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

8 miles of patching, pipe underdrain replacement and resurfacing on US 51 from the DeWitt County line to 0.1 miles north of Forsyth Road. Region 4 District 7 Federal Project # NHPPN8RC(715) County(s) Macon Key Route(s) FAP 322 Marked Route(s) US 51 Section(s) 50,51,52 RS-3 State Job #(s) C-97-053-17 PPS #(s) 7-50927-0000 Completion Date: 120 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 068 - Patching, Pipe underdrain replacement and resurfacing on US 51

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents