Similar Projects
New Consolidated Primary School
New Construction
Conception
Keyser, WV

Ruthlawn Elementary School Renovations
Addition - 2,877 SF
Bidding
South Charleston, WV 25309

New Stratton Elementary School
New Construction - 58,785 SF
Post-Bid
Beckley, WV 25801

Storage Buildings
New Construction
Post-Bid
New Cumberland, Weirton, WV 26047

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Orchard View Intermediate School Classroom Addition
Addition - 9,156 SF
Construction
Martinsburg, WV 25403

2018 Bond Work - Bid Package 4
Construction
$16,989,500 est. value
Wheeling, WV 26003

East Dale Elementary School Renovations
Renovation
Post-Bid
Fairmont, WV 26554

Washington Lands Elementary School Safe School Renovations
Renovation
Results
Moundsville, WV 26041

Secure Entrance Renovations for Mineral Wells Elementary and Greenmont Elementary project
Renovation
Post-Bid
Mineral Wells, Vienna, WV 26150

Safe School Entrance Renovations for Geary and Walton Elementary and Middle School
Renovation
Results
$618,000 est. value
Left Hand, WV 25251

Renovations to Lashmeet-Matoaka School, Bluefield Middle School and Montcalm High School
Alteration
Post-Bid
Bluefield, Matoaka, WV 24736

Outdoor Classrooms
New Construction
Results
Bradshaw, Iaeger, Welch, WV 24817

Learning Production Center for Cabell County Schools - Broadcast Center and Studio
New Construction
Post-Bid
Huntington, WV

Last Updated 08/27/2021 09:41 AM
Project Title

Renovations to Melrose Elementary School, Sun Valley Elementary School, and Silver Strings Early Learning Center

Physical Address View project details and contacts
City, State (County) Lerona, Princeton, WV 24739   (Mercer County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC renovations including replacement of rooftop HVAC equipment. a. Selective demolition and reconstruction of interior building construction including floors, walls, ceilings, and roof. b. New aluminum-framed storefront entrances and windows. c. Disconnection of plumbing, HVAC, and electrical systems from equipment to be either replaced or relocated. d. Protection of existing construction and equipment to remain. e. Provision of new interior construction including metal-framed gypsum board partition walls, new doors, new suspended acoustical panel ceilings where indicated, and room finishes. f. Plumbing, HVAC, and Electrical modifications and improvements required for the new air handling equipment. g. New electrical power distribution panels, circuits, and Overcurrent protection. h. Total clean-up of all areas affected by the work of this project.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents