Similar Projects
Last Updated | 09/29/2022 09:03 AM |
Project Title | Stonefield Town Center Block C2-1 |
Physical Address | View project details and contacts |
City, State (County) | Charlottesville, VA 22902 (Charlottesville City County) |
Category(s) | Heavy and Highway, Residential |
Sub-Category(s) | Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation |
Project Status | Construction start expected March 2022 |
Bids Due | View project details and contacts |
Estimated Value | $8,500,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2021-137: Stonefield Town Center Block C2-1 Review Type Initial Site Development Plan Parcel Identification 061W00300019A0 (portion) Zoned Neighborhood Model District (NMD), Entrance Corridor (EC) Owner/Applicant OTC Stonefield Property Owners, LLC / WW Associates, Inc (John Beirne, P.E.) Magisterial District Jack Jouett Proposal To construct a seven-story (maximum 90 feet tall) apartment building encompassing 36,400 square feet and consisting of a two-story parking garage and five stories of apartments on an undeveloped, 1.04-acre portion of this parcel. Location/Context The site is situated approximately 475 feet north of Hydraulic Road and approximately 830 feet west of Seminole Trail (Route 29), within The Shops at Stonefield town center. The Hyatt Place hotel lies to the immediate west, across District Avenue, and various restaurants and retail businesses lie to the south and east, along Bond Street. The lot has been cleared and graded and is currently vacant. Visibility A 7-story building will be clearly visible from Hydraulic Road through the surface parking lot south of the Hyatt Place hotel until the apartment building in Block D1 is constructed. The Regal Cinema and retail buildings; however, will block the visibility of the lower stories from view. The upper portions of the elevations will be visible from Hydraulic Road and Seminole Trail (Route 29). ARB Meeting Date January 3, 2022 Staff Contact Khris Taggart _______________________________________________________________________ The scope of work includes the construction of a new multi-family residential building. The project is in the planning sage. Information regarding the architect and general contractor has not been determined. Although a firm timeline for construction has not been determined, construction is not expected to begin before spring 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||||||
Details | New Construction, New Construction. 2 Stories Above Grade, New Construction, New Construction.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |