Similar Projects
Water Reclamation Facility Expansion
Addition
Design
Clermont, FL

Meadowlake Water Treatment Plant Expansion
Design
Less than $1,686,000 est. value
FL

Contract Operations for UCF's 3.024 MGD Water Treatment Plant
Bidding
Orlando, FL 32816

Water Treatment Plant A - Basin Railing Rehabilitation
New Construction
Bidding
Bradenton, FL 34212

City of Cocoa Chemical Conversion and Reliability Improvements
Post-Bid
Christmas, FL 32709

Water Treatment Plant Expansion
Addition, Term Contract
Post-Bid
Immokalee, FL 34142

General Electrical Design - Substations 9, 10, 11, and 12
Results
Less than $6,430,280 est. value
Miami, FL 33010

Sumterville Water Plant Improvements
Results
Less than $400,000 est. value
Bushnell, Sumterville, FL 33585

Hodge Street Water Production Facility Upgrades
Construction
$1,970,000 to $2,436,210 est. value
Satsuma, FL 32189

Greenland Water Treatment Plant (WTP) - Expansion from 6.0 to 9.0 MGD
Addition
Construction
Jacksonville, FL 32256

William S Smith Water Reclamation Facility Improvements
New Construction
Bidding
Brooksville, FL 34601

Design Build Services Cosme WTP Operational and SCADA Improvements
Post-Bid
Saint Petersburg, FL

Water Treatment Plant Degasifier Packing Media
Results
Hallandale, FL 33009

CR 136 / I-75 Water Treatment Plant
Construction
FL

North Lee County Wellfield Expansion to 15 MGD - Phase III-A
Addition
Bidding
FL

Last Updated 06/18/2021 01:50 PM
Project Title

Fort Myers Beach Water Reclamation Facility and Fiesta Village Water Reclamation Facility Surface Facilities Improvements

Physical Address View project details and contacts
City, State (County) Fort Myers, FL 33919   (Lee County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes civil, structural, mechanical, electrical, and instrumentation work to support the Fiesta Village Water Reclamation Facility Deep Injection Well, Fiesta Village Water Reclamation Facility Dual Zone Monitoring Well and Fort Myers Beach Water Reclamation Facility projects. The Surface Facilities project includes site work, new piping, transfer pump stations, and electrical upgrades.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents