Similar Projects
Annual Contract for Sewer Clean-Out
Term Contract
Post-Bid
Salt Lake City, UT

Combination Sewer Cleaner
Term Contract
Post-Bid
Salt Lake City, UT

10600 South Water Transmission Line and Harrison Street Storm Drain and Waterline Projects
Results
Sandy, UT

S Lone Peak Pkwy Storm Drain Project
Results
Less than $249,968 est. value
Draper, UT 84020

Storm Drain Video Project to Camera Storm Drain Pipes and Structures
Post-Bid
Taylorsville, UT 84129

Rush Trail Extension Phase 2
Results
Less than $50,000 est. value
Draper, UT

1700 South Storm Drain, from 2100 E to Emigration Creek
Post-Bid
Salt Lake City, UT 84115

Construction Bates Central Kitchen, Site Drainage and Grading
Results
West Valley City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Foothills Park Storm Drain Project
Results
Riverton, UT

Crown Street Storm Drain Improvement Project
Post-Bid
Taylorsville, UT 84129

H--Storm Drain Cleaning - Salt Lake City VAMC - Base + 4
Results
Salt Lake City, UT 84148

Lone Peak Elementary Storm Drain Upgrade
Post-Bid
Sandy, UT 84092

Derby Street Storm Drain
Results
Less than $432,565 est. value
West Valley City, UT

2019 Midvale Storm Drain Project
Results
$200,000 to $300,000 est. value
Midvale, UT

Last Updated 08/26/2019 12:38 PM
Project Title

Utahna Drive Storm Drain Project

Physical Address View project details and contacts
City, State (County) Murray, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project will involve: improvements to the existing detention basin just west of 300 West at about 5750 South including excavation and grading of the basin to increase capacity, the removal of existing control structures, and the construction of inlet and outlet structures; installation of about 350 feet of 48 inch steel pipe under private property as well as UTA Right-of-Way (TRAX) using trenchless method, 350 feet 42 inch DR 32.5 HDPE pipe installed in the 48 inch steel pipe, installation of about 350 feet of 48-inch RCP storm drain pipe , 320 feet of 36-inch RCP storm drain pipe, 250 feet of 24-inch RCP storm drain pipe, 70 feet of 18-inch RCP storm drain pipe in Utahna Drive. The project also includes the installation of manholes, inlet and combo boxes.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents