Similar Projects
Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Installation of a Walking Track
Infrastructure
Post-Bid
Overland, MO

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

Parking Lot Rehabilitation
Infrastructure
Post-Bid
Chesterfield, MO 63005

Asphalt Overlay Improvements
Results
University City, MO

Saint Vincent Greenway: Trojan Park to Robert L. Powell Place
New Construction, Infrastructure
Post-Bid
Saint Louis, MO 63133

Kirkwood School District Paving Maintenance Projects 2021
Term Contract
Results
Kirkwood, Saint Louis, MO 63122

Rehabilitation of Abandoned Property
Renovation, Infrastructure
Post-Bid
Ferguson, MO

2021 Concrete Pavement Replacement
Infrastructure
Results
Bridgeton, MO 63044

Property Redevelopment
Infrastructure
Post-Bid
Saint Louis, MO 63121

2020 CRS Pavement Rehabilitation
Infrastructure
Results
MO

Last Updated 11/09/2022 11:38 AM
Project Title

Beasley Elementary School Driveway and Parking Lot - 2021 Bond Proposition S - Mehlville School District

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63125   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $375,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been identified. As of November 9, 2022, this project is part of the $35 million Proposition S Bond which was passed and approved by the voters on April 6, 2021. Information regarding a construction manager/general contractor is not available. A timeline for construction has not been determined. The project is on indefinite hold. Further details regarding design and construction timelines have not been identified.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents