Similar Projects
Phase 5 School Bond Renovation
Renovation, Addition
Conception
Arlington, TX

New Elementary School Cedar Creek
New Construction
Conception
Cedar Creek, TX

Maintenance & Operations Facility - Socorro Independent School District
New Construction
Design
$10,610,000 est. value
El Paso, TX

New Middle School #5
New Construction
Design
Prosper, TX

Door Repairs
Renovation
Bidding
$200,000 CJ est. value
Corpus Christi, TX 78401

ORG 121 - John W. Carpenter Elementary School - Renovation
Renovation
Bidding
$5,630,002 CJ est. value
Dallas, TX 75224

2023-2025 Sound Engineering Services
Term Contract
Sub-Bidding
The Woodlands, TX 77380

Harmony Science Academy Lubbock - Relocation
Renovation - 67,000 SF
Post-Bid
Less than $5,000,000 est. value
Lubbock, TX 79407

Completion of Elite College Prep Academy
New Construction - 174,938 SF
Post-Bid
Houston, TX

Renovations at Pickle Elementary School
Renovation
Results
$1,579,650 est. value
Austin, TX 78752

New Elementary School 6 and New Middle School 2
New Construction - 360,000 SF
Results
Less than $75,000,000 est. value
Cleveland, TX

New Elementary School in the Caney Creek Feeder Zone - Flex School #20
New Construction
Construction
Less than $28,075,000 est. value
Conroe, TX

Construction Manager at Risk New Elementary in the Conroe High Feeder Zone Flex #21
New Construction
Construction
$29,758,680 est. value
Conroe, TX 77304

Katy ISD Schmalz Elementary School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure - 20,532 SF
Pending Verification
$7,133,736 CJ est. value
Houston, TX 77084

Freeman Elementary School Renovation
Renovation
Pending Verification
Irving, TX 75063

Last Updated 09/08/2022 01:41 PM
Project Title

2018 Bond - Berkman Elementary School HVAC - Round Rock ISD

Physical Address View project details and contacts
City, State (County) Round Rock, TX 78664   (Williamson County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected May 2020
Bids Due View project details and contacts
Estimated Value $2,344,723 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2018 Bond - Berkman Elementary School HVAC Replace AHU'S, CU's, EXF's, HP's and RTU's Per the owner, as of August 7, 2019, the 2018 Bond was passed and approved by the voters on November 6, 2018. A design team has been identified. Construction is anticipated to begin in May 2020. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents