Similar Projects
City Hall Offices & Plaza
New Construction
Design
Kenosha, WI 53140

Lions and Biwer Park Improvements
Bidding
New Berlin, WI

Lions Park Playground
Bidding
New Berlin, WI

Don Almquist Playground Reconstruction
Post-Bid
Greenfield, WI 53220

Playground Equipment for 2 (Two) City Parks
Post-Bid
Less than $48,000 est. value
Green Bay, WI 54302

Playground Replacements at Sunny Valley and Hunter's Ridge Parks
Results
Less than $90,000 est. value
Sun Prairie, WI 53590

Burton Park Playground Surfacing
Results
$75,000 est. value
Hudson, WI 54016

The Boneyard
New Construction - 2,400 SF
Construction
$500,000 to $1,000,000 CJ est. value
Madison, WI

Apostle Islands Area Campground Expansion
New Construction
Pending Verification
Bayfield, Red Cliff, WI

Somersville Residential Development
New Construction - 9,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Kenosha, Somers, WI 53144

Birkinbine, Grandview, Reserve and West Prairie Village Parks Playground Project
Bidding
$280,000 est. value
Sun Prairie, WI 53590

Veterans Memorial Field South Softball Field Site Redevelopment
Post-Bid
Portage, WI 53901

2021 Tennis Court Rehabilitation at Neenah High School
Results
Neenah, WI 54956

Veterans Memorial Park - West Parkway, Honor Plaza, and Trail Expansion
New Construction
Bidding
Bristol, WI

Claflin Park Restoration and Riprap Installation
Post-Bid
Sturgeon Bay, WI

Reported 02/19/2021 12:00 AM
Project Title

Bukolt Park Playground Development

Physical Address View project details and contacts
City, State (County) Stevens Point, WI 54481   (Portage County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

BASE BID 1. Park playground development project with work including, but not limited to, stripping and placing topsoil, common excavation, concrete pavement, dense graded base, erosion control, seeding, and site restoration. CONTRACT “A – ALTERNATE 1” – STORM SEWER ADDITIONS 1. Provide and install storm sewer to provide drainage around playground interior and connections to existing storm sewer.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents