Similar Projects
Theriot Terrace Apartments
New Construction - 2,460 SF
Design
$500,000 to $1,000,000 CJ est. value
Sterling Heights, MI 48312

Waldenburg Park Improvements
Renovation
Bidding
Macomb Township, MI

Ridgewood Park Improvements
Bidding
Warren, MI 48088

Athletic Field Renovation
Post-Bid
Richmond, MI

Recreation Center Splash Pad
Post-Bid
Less than $350,000 est. value
Center Line, MI 48015

Playground Equipment Projects
Results
Clinton Township, MI

Webber Paddle Park Development
Results
Less than $294,513 est. value
Chesterfield Township, MI 48047

Memorial Park Soccer Field
New Construction
Post-Bid
Mount Clemens, MI

Memorial Park – Building and Site Improvements
Results
Eastpointe, MI 48021

Brandenburg Park Sports Courts Rehabilitation
Renovation
Post-Bid
Chesterfield, MI

Goetz Park Improvements
Results
Eastpointe, MI

Baseball Diamond Rehabilitation at Shadyside Park
Post-Bid
Mount Clemens, MI 48043

Playground Soft Surface Material
Results
Utica, MI

Beebe's Corner Park
Results
Warren, MI 48093

2020 CDBG Roxana Park Improvements – Phase II
Results
Eastpointe, MI 48021

Last Updated 04/07/2021 01:47 PM
Project Title

Stilwell Manor Parking Lot Rehabilitation

Physical Address View project details and contacts
City, State (County) Warren, MI   (Macomb County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project is to Pulverize existing bituminous pavement to a minimum depth of 6” for the entire lot. Provide saw cuts and butt joints, remove existing HMA and concrete pavement. Excavate, grade and shape subgrade and supplement with aggregate material, as necessary. Install 6” underdrains as directed, install concrete sidewalks, adjust/reconstruct catch basin. Pave entire lot with 4” HMA and re-stripe lot as shown on plans. Install guardrail and complete all turf restoration.

Details

Park/Playground, Addition.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents