Similar Projects
Wastewater Pump Station Improvements
Design
North Bay Village, FL

Comprehensive Everglades Restoration Plan, Biscayne Bay Coastal Wetlands, L-31E Flow-Way, Contract 5C (A Phase I Project): Pump Stations S-710 And S-711; Seepage Canal C-711W; Miami-Dade County, Florida
New Construction
Design
$15,000,000 to $25,000,000 est. value
Miami, FL

Lift Station No. 38
New Construction
Bidding
$98,819 est. value
Melbourne, FL 32901

Waste Water Treatment Facility Digester to Eq Tank Conversion
Renovation
Bidding
Haines City, FL 33844

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Lanark East Lift Station
Results
Carrabelle, FL

Tree Tops Lift Station
Renovation
Bidding
Tampa, FL 33637

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Lift Station, Grease Trap and Septic Tank Pump and Maintenance
Term Contract
Results
Less than $300,000 est. value
Viera, FL 32940

RIVERTOWN PARCEL 1 "Public Utilities" JEA Lift Station, Reclaimed Main and Sewer Improvements
New Construction
Bidding
Jacksonville, FL

Progressive Design Build Services Lift Station 87
Post-Bid
Saint Petersburg, FL 33731

Lift Station LS-29 Rehabilitation
Results
Less than $444,067 est. value
Jacksonville Beach, FL 32250

Lift Station No. 1 Replacement Project
New Construction
Bidding
Cocoa, FL 32922

Reported 07/09/2021 12:00 AM
Project Title

Fort Gatlin Lift Station

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all materials, equipment and labor for the installation of two (2) lift stations.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents