Similar Projects
St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14
Term Contract
Design
$1,000,000 to $5,000,000 est. value

Orangewood Boulevard and Gateway Avenue Intersection Improvements
Infrastructure
Bidding
$3,910,270 est. value
Orlando, FL 32821

Orange County Cady Way Trail Drainage Improvements
Infrastructure
Bidding
$235,000 est. value
Winter Park, FL 32792

Poitras East Master Infrastructure Phase 1B
Post-Bid
Orlando, FL

Underdrains Installation and Repairs
Post-Bid
Less than $6,771,550 est. value
FL

Fuel Island Drain Installation
Results
Orlando, FL 32801

Lido Street Drainage Improvements
Results
Less than $1,371,623 est. value
Orlando, FL 32807

Andover Lakes Subdivision Underdrain Installation
Post-Bid
$1,699,115 est. value
FL

Stormwater Pond and Primary Canal Cleaning and Restoration Services
Term Contract
Results
$4,400,000 est. value
FL

Poitras East Master Infrastructure Phase 1C and Centerline Drive Segment F
Post-Bid
Winter Park, FL

Orange County Kelly Park Seawall Repair 5 Year Plan
Term Contract
Results
Less than $500,000 est. value
Apopka, FL 32712

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Magnolia Avenue, Arbor Park Road, Oneco Avenue Drainage Project (Magnolia Avenue Phase Only)
Results
Winter Park, FL 32789

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Countywide Restoration of Shoulders and Ditches
Term Contract
Results
Less than $5,121,550 est. value
FL

Last Updated 11/17/2021 01:18 PM
Project Title

Lake Ivanhoe Basin Area 6 Drainage Improvements

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,962,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The reconstruction of Ivanhoe Boulevard from Dartmouth Street to Harrison Avenue, University Drive from Ivanhoe Boulevard to approximately 800 feet north, Harrison Avenue from Ivanhoe Boulevard to approximately 600 feet north, West Yale Road from University Drive to approximately 550 feet east, and Elizabeth Avenue from West Yale Road to approximately 200 feet north. The storm sewer improvements consist 18-inch to 72-inch reinforced concrete pipes, manholes, inlets, and a second-generation baffle box to reduce phosphorus and nitrogen loadings to Lake Ivanhoe. The reconstruction of the existing residential streets within the project area will be asphalt/brick pavement replacement. The project also includes replacements of existing sanitary sewer and laterals, and Orlando Utilities Commission (OUC) water mains

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents