Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

ID Bor Lake Cascades (1) Dam Crest Road Improvements
Term Contract
Design
Cascade, ID

SH-16, Ustick Road to US-20/26
Infrastructure
Bidding
$25,000,000 est. value
Eagle, ID 83616

US-95, Sagle Rd to Long BR Interim Imprv. Ph 2
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
Sandpoint, ID 83809

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Post-Bid
$10,000,000 to $15,000,000 est. value

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

I 90 Cedars to Dudley Rd
Infrastructure
Bidding
$15,000,000 to $25,000,000 est. value
Coeur d'Alene, ID 83815

2022 Road Improvement Projects
Infrastructure
Post-Bid
Hayden, ID 83835

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Warranty Double Chip Seal Coat
Infrastructure
Post-Bid
Lewiston, ID

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Supply and Apply Gravel Road Stabilization
Infrastructure
Post-Bid
Coeur d'Alene, ID

Mill and Inlay on I-90 From Wallace MP 63 to Mullan MP 68
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Reported 05/13/2022 12:00 AM
Project Title

Ustick Road and Santa Ana Avenue Roundabout

Physical Address View project details and contacts
City, State (County) Nampa, ID 83687   (Canyon County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a roundabout, RRFB pedestrian crossings, street lighting and storm water infrastructure at the intersection of Ustick Road and Santa Ana Avenue.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 22 - Plumbing, Facility Sanitary Sewerage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents