Similar Projects
Rehabilitate Runway 12-30 at Altoona-Blair County Airport
Bidding
Martinsburg, PA 16662

Taxiway `N` Rehabilitation Project at Pittsburg International Airport
Bidding
Pittsburgh, PA 15231

Arnold Palmer Regional Airport - Apron Strengthening
Post-Bid
Latrobe, PA 15650

Rehabilitate T-Hangar Taxiway
Post-Bid
Greenville, PA 16125

Rehabilitate Apron, Phase II - Construction
Results
Bloomsburg, PA

Construction of Rehabilitate Taxiway D (East)
Results
Avoca, PA 18641

Rehabilitate Runway 4-22
Renovation
Construction
Factoryville, PA 18419

University Park Airport Rehabilitate Taxiway A
Renovation - 1,700 SF
Construction
State College, PA 16803

Runway 8-26 Rehabilitation Phase IV Bid Package 2
Bidding
Lititz, PA

Rehabilitate Runway (Crack Seal and Remarking Including Taxiway)
Post-Bid
Shippenville, PA 16254

Rehabilitate Airport Access Road
Results
Paxinos, PA 17860

Taxiway F Rehabilitation
Bidding
Lemont Furnace, PA

Zelienople Municipal Airport: Phase 1, Rehabilitate Runway 17-35
Post-Bid
Zelienople, PA 16063

Crack Seal and Re-Mark Airport Pavements
Results
Mercer, PA 16137

Realignment of Taxiway P (Between Taxiways U and N)
Bidding
$5,000,000 est. value
Philadelphia, PA 19153

Last Updated 04/19/2021 04:04 AM
Project Title

Gettysburg Regional Airport (GRA) Construct South Apron, Phase IV

Physical Address View project details and contacts
City, State (County) Gettysburg, PA 17325   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the mass grading of the southeastern side of the existing airport to prepare for future hangar, building, and pavement construction. Excess material excavated from this area will be placed on the northside of the runway for future projects, utilized to fill in an existing wet pond, and the remaining material exported off the project site. Stormwater facilities including storm sewers, two detention basins, and two rain gardens will be constructed with the project. An existing wind cone and segmented circle will be reconstructed in a different location at the site. Erosion and sedimentation control facilities will be installed for the project to control sediment and the entire disturbed area will be seed and mulched to prepare for future phases of construction.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents