Similar Projects
Skunk Hollow Pond for Regional Downtown Area - STM 18 - City of Littleton
Infrastructure
Conception
$500,000 CJ est. value
Littleton, CO 80122

Rangeview Gulch Detention - STM 02 - City of Littleton
Infrastructure
Conception
$700,000 CJ est. value
Littleton, CO 80120

Murphy Creek Parcel 3E South
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Aurora, CO 80011

Innovus
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Aurora, CO 80018

RFP - Construction Consultant: Estimation, Project Management and Construction
Demolition, New Construction, Infrastructure
Bidding
Aurora, CO 80011

SC2, SC5 and S. Ouray Way Sanitary Sewer Upgrade Project
Infrastructure
Post-Bid
$5,200,000 CJ est. value
Aurora, CO 80011

Medical Office Shell Building / Aurora
New Construction, Infrastructure - 11,240 SF
Post-Bid
$2,700,000 CJ est. value
Aurora, CO 80015

Piney Creek Lift Station Upgrades
Renovation, Infrastructure
Results
$4,182,300 CJ est. value
Aurora, CO 80011

2022 Capital Improvement Program (CIP) Project
Infrastructure
Results
$290,227 CJ est. value
Aurora, CO 80011

QuikTrip #4250 / Greenwood Village
Demolition, New Construction, Infrastructure - 4,993 SF
Construction
$1,300,000 CJ est. value
Greenwood Village, CO 80112

Englewood Station Apartments
New Construction, Infrastructure
Construction
$83,000,000 CJ est. value
Englewood, CO 80110

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

King Soopers Fuel at Arapahoe Crossing
Demolition, New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80016

ACJC Employee Parking Lot Reconstruction - Arapahoe County
Infrastructure
Conception
$2,036,000 CJ est. value
Englewood, CO 80112

Living Water Express Car Wash
New Construction, Infrastructure
Design
$750,000 CJ est. value
Aurora, CO 80012

Last Updated 08/28/2023 07:07 AM
Project Title

South Platte Bank Stabilization Phase 2

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000327126 Question Deadline 08/18/2023 at 2:00 PM MT Any questions must be submitted in writing by email to Ted Hartfelder, Project Manager, at thartfel@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org. Emailed questions shall contain the project name and number in the email subject line and must be received Questions will be answered via addendum posted to The Rocky Mountain E-Purchasing System aka BidNet. This Project entails the design and subsequent construction of riverbank stabilization measures along an approximately 700-foot reach of the South Platte River at the City of Auroras (Citys) Prairie Waters System North Campus Well Field (Well Field). The Well Field, located on the west bank of the South Platte River approximately midway between Brighton and Fort Lupton, consists of a series of groundwater production wells which indirectly capture water from the South Platte River for the Citys consumptive use. These groundwater production wells are offset approximately 100 to 200 feet from the riverbank. Subsequent to construction, the Well Field periodically has experienced riverbank erosional damage resultant from channel alignment changes due to human and/or natural causes. As the Well Fields infrastructure is near the riverbank, riverbank erosion poses a threat to this infrastructure. This project addresses the most recent riverbank erosion threat to the Well Field. Under this Project the riverbank within the reach will be properly stabilized, and where appropriate the bank edges will be restored (built up) to sufficiently protect the existing Well Field infrastructure. This work will include, but not be limited to, general grading and earthwork; dewatering and erosion control; placement of mixed and buried rock riprap; placement of COIR (or equivalent) blankets; and plantings for wetland, upland, and transition zone vegetation. Bank restoration and placement of riprap will require temporary diversion of the South Platte River and active dewatering at the toe of the reclaimed slope. All Project work will be performed on City-owned property. The estimated cost for this project is from $1,300,000.00 to $1,600,000.00. The Contract Documents require that all work be Substantially Complete by December 29, 2023 with Final Completion by February 2, 2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City shall have the right to reject any and all Bids. A Bid not accompanied by the required Bid Security, other data or documentation required, or a Bid in any other way incomplete, irregular or unqualified, may be subject to rejection.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents