Similar Projects
Fire Station Number 6 - FM-22-1811 - City of Lawrence
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Lawrence, KS 66044

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

2022 Microsurfacing, Milling, Patch, Overlay and Concrete Maintenance Program
Infrastructure
Bidding
$700,000 CJ est. value
Lawrence, KS 66044

2022 Microsurfacing, Milling, Patch, Overlay and Concrete Maintenance Program
Infrastructure
Bidding
$700,000 CJ est. value
Lawrence, KS 66044

CDBG Office Building
New Construction - 7,185 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Eudora, KS 66025

N1200 Road Improvements
Infrastructure
Post-Bid
Eudora, KS 66025

Mill and Overlay
Results
$831,421 est. value
KS

Chip and Seal
Results
$535,242 est. value
KS

Jayhawk Welcome Center
Addition - 11,662 SF
Construction
$21,000,000 est. value
Lawrence, KS 66044

902 Storage / Lawrence
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Lawrence, KS 66049

902 Storage / Lawrence
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Lawrence, KS 66049

Quail Creek Apartments Clubhouse/Pool
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Lawrence, KS 66047

2022 Crack seal Program (Various City Street Locations)
Infrastructure
Bidding
$45,000 CJ est. value
Lawrence, KS 66044

Linear Grading, Reinforced Concrete Pipe, Subgrade Modification
Infrastructure, Alteration
Post-Bid
Eudora, KS 66025

Last Updated 08/22/2022 05:33 PM
Project Title

City of Lawrence Field Operations Campus

Physical Address View project details and contacts
City, State (County) Lawrence, KS 66044   (Douglas County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Office, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $29,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: 75-acre campus would house seven structures or buildings. The facility master plan for the field operations campus includes a fuel island, a central maintenance garage and buildings for solid waste, facilities, household hazardous waste and forestry and horticulture. The biggest building on the campus is the public works building, which would house the city's water, wastewater, streets, stormwater, traffic and inspections divisions. As of August 2022, the project is in schematic design. The city is working on site issues and requires funding approval. The Lawrence City Commission held a meeting on October 12, 2021. The project requires municipal funding approval. A firm construction schedule has not been established. Conceptual & Preliminary Design – Complete by November 2020 Development of Planning submittal documents – 2021 Phase 1 and 2 of Schematic Design – 2022 Construction – 2024

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents