Similar Projects
Median Hightension Cable Barrier Installation - TH 10
Infrastructure
Conception
$2,200,000 CJ est. value
Elk River, MN 55330

Median Hightension Cable Barrier Installation - TH 10
Infrastructure
Conception
$2,200,000 CJ est. value
Elk River, MN 55330

2023-2024 Lincoln Elementary School Addition and Renovations
Addition, Demolition, Renovation, Infrastructure - 965 SF
Bidding
$13,000,000 CJ est. value
Elk River, MN 55330

2023-2024 Handke Center Addition and Renovations
Addition, Demolition, Renovation, Infrastructure
Bidding
$10,250,000 CJ est. value
Elk River, MN 55330

Becker Public Schools ISD 726 - Intermediate School Additions and Renovations(IAQ)
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$7,750,000 CJ est. value
Becker, MN 55308

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 History Center Trail
Infrastructure
Post-Bid
Elk River, MN

Bridgeview Park Parking Lot/Trail
Results
Big Lake, MN 55309

2021 Highway 169 Turn Lanes (R-Cuts)
Results
$866,377 est. value
MN

U.S. Highway 10/169 - Anoka County
Infrastructure
Pending Verification
$80,000,000 CJ est. value
Elk River, MN 55330

U.S. Highway 10/169 - Anoka County
Infrastructure
Pending Verification
$80,000,000 CJ est. value
Elk River, MN 55330

Intersection Improvement - TH 25
Infrastructure
Conception
$670,000 CJ est. value
Big Lake, MN 55309

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

2021 CSAH 2 Resurfacing
Results
$2,748,124 est. value
MN

2021 CR 42 and 70 Surface Improvements
Infrastructure
Post-Bid
MN

Last Updated 09/09/2022 09:11 AM
Project Title

2022 Street Improvements

Physical Address View project details and contacts
City, State (County) Becker, MN 55308   (Sherburne County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,044,990 [brand] Estimate
Plans Available from Copy Center - 06/01/22
Owner View project details and contacts
Architect View project details and contacts
Description

Major quantities for the Work include: 475 SY Remove Concrete Walk 1,500 LIN FT Remove Concrete Curb & Gutter 575 LIN FT Sawing Concrete Pavement 800 LIN FT Sawing Bituminous Pavement 4,300 CU YD Common Excavation 1,800 TON Aggregate Base Class 5 51,500 SY Full Depth Reclamation 6,125 TON Bituminous Wearing Course 4,950 SQ FT 6-Inch Concrete Walk 500 SQ FT Truncated Domes 1,500 LIN FT Concrete Curb & Gutter 55 EA Adjust Frame & Ring Casting 265 SQ FT F&I Sign Panels Type C 300 CU YD Topsoil Borrow 0.25 AC Seeding 2 EA Rigid PVC Loop Detector 6-feet x 6-feet. Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. A Contractor responding to these Bidding Documents must submit to the City/Owner a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3. Any person monitoring the meeting remotely may be responsible for any documented costs. Message and data rates may apply.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents