Similar Projects
Last Updated | 01/03/2020 10:38 AM |
Project Title | Fuel Oil Tank Replacement at Present Philip R. Smith at 350 Foster Street |
Physical Address | View project details and contacts |
City, State (County) | South Windsor, CT 06074 (Hartford County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Fuel/Chemical Tanks and Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. Provide all labor, materials, equipment and tools required for the removal of the existing 10,000 gallon buried single wall fiberglass fuel oil storage tank, piping, fuel inventory equipment and accessories and the complete backfill, compaction and repaving/reseeding of the tank site. 1. The existing concrete hold-down pad may remain in place if the concrete is deemed to be not contaminated with any oil or hydrocarbons. 2. Provide a separate price to remove the concrete pad in the event that contamination is discovered or the Owner desires to have the concrete removed. B. Remove existing underground containment type fuel oil supply and return piping and the existing tank vent piping and inventory management cabling and conduits. C. The Contractor will be responsible for extracting soil samples and having sample analyses conducted to determine if any oil or other hydrocarbon contamination exists. Sampling and analyses shall be completed prior to removing any soils from the site. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |