Similar Projects
Last Updated | 02/15/2022 09:12 AM |
Project Title | Southside Force Main Rehabilitation - Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | GA (Douglas County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope: The work shall include rehabilitation to approximately 4000 LF of 24” DIP force main that has been degraded by exposure to hydrogen sulfide gas. Rehabilitation may include open trench replacement of the line, pipe bursting, or installation of a liner system such as Cured-In-Place Pipe (CIPP), or any combination thereof. The finished product shall be of a material that is inert to hydrogen sulfide. If replacement with DIP is proposed, the DIP shall be lined with a ceramic epoxy lining such as Tnemec Series 431 Perma-Shield PL or approved equal. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |