Similar Projects
Glendale Middle School Science Lab
Post-Bid
Salt Lake City, UT 84104

Bryant Middle School Science Lab Remodel
Renovation
Post-Bid
Salt Lake City, UT 84102

Building 72 Eae Master Plan and Phase 1 Buildout
Results
Less than $328,231 est. value
Salt Lake City, UT

Cottonwood High Theater Remodel
Renovation
Results
Less than $100,000 est. value
Murray, UT 84121

American Academy of Innovation Charter School
Addition - 3,285 SF
Construction
South Jordan, UT 84095

Granite Education Center Lobby and Cafe Remodel
Construction
$300,000 to $350,000 est. value
Salt Lake City, UT 84115

Beehive Academy
New Construction - 77,584 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Draper, UT 84020

Skyline High School Replacement Athletics
Post-Bid
Salt Lake City, UT 84109

Portable Classroom General Repairs
Term Contract
Results
Less than $40,000 est. value
Salt Lake City, UT

Oquirrh Hills Middle Remodel - Part II
Renovation
Construction
Riverton, UT 84065

Union Middle School Replacement
Term Contract
Post-Bid
$55,000,000 est. value
Sandy, UT 84070

General Contractors Pre-Qualification
Results
Sandy, UT 84070

Granite Park Junior High School Remodel
Renovation
Construction
$1,500,000 est. value
Salt Lake City, UT 84115

New Cyprus High School
New Construction
Post-Bid
$145,000,000 est. value
Magna, UT 84044

Riverton High School Cafeteria Remodel Part II
Renovation
Results
Riverton, UT 84065

Reported 01/22/2021 12:00 AM
Project Title

Construction: GEC Cafe Dish Room Remodel

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84115   (Salt Lake County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

General contractor to perform a remodel of the existing Granite Education Center (GEC) café dish room, including, but not limited to, the following: 1. Removal of existing kitchen equipment, including, but not limited to: rinse tables, disposals, wall racks and shelves, dish washer, stainless steel tables, and threecompartment sink. Equipment indicated to remain shall be removed from work area and protected from damage for re-installation. 2. Removal of applied wall finishes/F.R.P. 3. Modification of specified kitchen equipment. 4. Preparation of floor/slab for installation of new floor finishes. 5. Patching and repair of walls and ceilings from equipment and room modifications. 6. Modification of Mechanical and Plumbing systems. 7. Modification of Lighting and Electrical systems. 8. Installation of new and modified kitchen equipment and stainless steel wall flashings, and re-installation of items indicated to remain.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents