Last Updated 01/16/2020 07:52 AM
Project Title

Reconstruction - Spartanburg County

Physical Address View project details and contacts
City, State (County) SC   (Spartanburg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Borrow Excavation 486.000 Cy Cement Modified Recycled Base (12" Unif)-Curing Method b 34,214.000 Sy Portland Cement For Cement Modified Recycled Base Course 1,368.000 Ton Maintenance Stone 55.000 Ton Liquid Asphalt Binder Pg64-22 485.830 Ton Full Depth Asph. Pav. Patching 8" Unif 500.000 Sy Milling Existing Asphalt Pavement 1.75" 15,310.000 Sy Milling Existing Asphalt Pavement (Variable) 550.000 Sy Milled-In Rumble Strip 4.860 Mi Hot Mix Asphalt Intermediate Course Type b 3,421.440 Ton Hot Mix Asphalt Surface Course Type b 4,923.307 Ton Hot Mix Asphalt Surface Course Type c 493.000 Ton Driveway Paving-Surface Type c 347.000 Ton Permanent Construction Signs (Ground Mounted) 484.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 860.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 90,499.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 2,760.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 470.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 32.000 Ea 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 187,036.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 430.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 32,419.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 1,380.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 210.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 16.000 Ea 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 35,351.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 43.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 354.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 210.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 100.000 Lf Sawcut For Loop Detector 1,300.000 Lf f&i-13"x24"x18"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 3.000 Ea Furnish & Install Video Detection Camera w/ Hardware & Lead-In 2.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 2.340 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents