Similar Projects
Water Treatment Plant Improvements
Renovation, Addition - 720 SF
Results
$500,000 est. value
Bronson, KS 66716

2022 Water Treatment Plant Improvements
Renovation
Results
Highland, KS

Clinton Water Treatment Plant Piping Improvements
Results
Lawrence, KS 66047

Kansas River Wastewater Treatment Plant Improvements
New Construction
Post-Bid
Lawrence, KS

Water Treatment Plant Improvements Phase 2
Results
Junction City, KS

Rfp - Hillsdale Wtp Waste And Residuals Basin Cleanout
Renovation, Term Contract
Results
Gardner, KS 66030

Middle Basin WWTF Thickening Improvements
Renovation
Results
Overland Park, KS 66210

Hansen Water Treatment Plant Facility 1 Improvements Phase I
Renovation
Bidding
$7,500,000 est. value
Kansas City, KS 66106

WTP Turbidity and Actuator Upgrades
Renovation
Post-Bid
Emporia, KS 66801

Water Treatment Plant Improvements
Renovation
Results
Belleville, KS

Russell Water Treatment Plant A Improvements
Renovation
Results
Russell, KS 67665

Piping Improvements and Water Meter Replacement
Renovation, Infrastructure
Post-Bid
Less than $1,250,000 est. value
Wichita, KS 67205

Emerald Bay Water Distribution System
Infrastructure
Results
Wichita, KS 67212

Grit Removal Services
Renovation, Term Contract
Results
Wichita, KS

City of Wichita Northwest Water Facility (NWWF)
Addition
Post-Bid
Wichita, KS 67203

Reported 05/27/2022 12:00 AM
Project Title

Natural Gas Distribution and Heating Improvements Middle Basin Waste Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Overland Park, KS 66210   (Johnson County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Middle Basin WWTP Natural Gas Distribution and Heating Improvements. This Work includes construction, installation, and completion of all work required to convert building heat to natural gas in buildings 5, 6 and 8, install electric heating in building 2, increase ventilation in buildings 5 and 8, install a natural gas supply to all buildings at the plant that don't currently have a gas connection and any other associated work shown on plans or described in the technical specifications.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents