Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

Lift Station No. 46
New Construction
Bidding
Melbourne, FL 32904

Lift Station 14A Force Main Replacement
Renovation, Infrastructure
Bidding
Coral Springs, FL

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Lift Station No. 6 Relocation and Collection System Improvements
Renovation
Post-Bid
Mulberry, FL 33860

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Construction Services for the Southwest - 5404 118th Street and 6217 Wilson Boulevard - Class III/IV Pump Station Upgrades
New Construction
Bidding
Jacksonville, FL 32244

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Cooper Creek Lift Station Relocation
Renovation
Construction
$1,200,000 est. value
University Park, FL 34201

Tradewinds WRF Decommissioning and Force Main
New Construction
Bidding
$1,600,000 est. value
FL

Improvements to Master Repump Station 9-North WUD
Post-Bid
$3,200,000 est. value
West Palm Beach, FL

Last Updated 10/07/2021 01:45 PM
Project Title

Lift Station No. 3 Replacement Project

Physical Address View project details and contacts
City, State (County) Plantation, FL 33324   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $790,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of the Contract comprises the replacement of the existing Lift Station #3 in the City of Plantation. The Work set forth within the bid/proposal documents includes the furnishing of all labor, materials, equipment, services, coordination and incidentals for demolishing the existing drywell and all equipment, converting the existing wetwell to a manhole, installing a new wetwell, valve vault, new pumps, piping, valves, fittings, and electrical equipment, connection to existing forcemain, new electrical service and transformers to be provided by FPL and all other work shown on the Drawings. Maintenance of all utility services including sanitary service is mandated throughout the construction period. The Work is located at 8990 Gatehouse Road in the City of Plantation in Broward County, and is located in a residential neighborhood

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents