Similar Projects
Hobbs Island Road Bridge Replacement - City Of Huntsville
Demolition, New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Huntsville, AL 35803

Buck Creek Trail Enhancements - City of Alabaster
Infrastructure, Renovation
Conception
$817,500 CJ est. value
Alabaster, AL 35124

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Welcome Center Replacement (Site Construction/Grading, Drainage, Pavement, Lighting, and Structures) on I-65
Infrastructure
Post-Bid
$6,612,039 CJ est. value
Athens, AL 35613

Brewton Bridge Trail Restoration
Renovation
Post-Bid
Brewton, AL

Replacement of Elastomeric Bearing Type 1
New Construction
Results
$46,782 est. value
Clanton, AL

Constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge Removal)
New Construction, Infrastructure
Results
$3,424,496 to $4,185,496 est. value
AL

U.S. 31 Bridge Replacement Over Peavine Creek
New Construction
Pending Verification
$5,732,000 CJ est. value
Pelham, AL 35124

Memorial Parkway Pedestrian Skybridge - City of Huntsville
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Huntsville, AL 35810

Alabama Cruise Terminal SPBB Gangway Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Mobile, AL 36602

RFQ D/B - West Alabama Highway Design -Build Project
Infrastructure
Post-Bid
$775,000,000 CJ est. value
Montgomery, AL 36104

Constructing the Bridge Replacements and Approaches
New Construction, Infrastructure
Results
$1,096,719 to $1,340,434 est. value
AL

RFP - I-10 Mobile River Bridge Project
New Construction, Infrastructure
Bidding
$1,600,000,000 CJ est. value
Mobile, AL 36602

Parking Lot Sweeping Services
Infrastructure
Post-Bid
Huntsville, AL

Last Updated 12/05/2022 06:23 AM
Project Title

Micro-Milling, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-21 (US-231)

Physical Address View project details and contacts
City, State (County) Rockford, AL 35136   (Coosa County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,598,778 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Monroe Constructing the Micro-Milling, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-21 (US-231) from the Elmore County Line to a point 0.560 mile south of the intersection of SR-22 in Rockford. Length 9.155 mi. The Bracket Estimate on this project is from $2,940,838 to $3,594,258 . Contract Time: 60 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 019 - Micro-Milling, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-21 (US-231) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents