Similar Projects
Flooring Project at Lumberton Elementary School
Post-Bid
Lumberton, MS 39455

Hallway Painting and Flooring Replacement
Alteration
Post-Bid
Gulfport, MS 39503

Repair Shower Floor
Design
$250,000 to $500,000 est. value
Yazoo City, MS 39194

Dormitory Flooring Installation
Post-Bid
Lorman, MS

Public Safety Communications Center Furniture, Consoles and Carpet Replacement
Alteration
Post-Bid
Biloxi, MS

Installation of Volleyball Equipment and Floor Refinishing
Post-Bid
Tupelo, MS

Gym Floor Replacement
Alteration
Results
$163,232 est. value
Purvis, MS

Oak Grove Middle School Gym Floor Replacement
Alteration
Bidding
Hattiesburg, MS 39402

Leake County Schools Toilet Floor Replacement
Post-Bid
$200,000 est. value
Carthage, MS

Gymnasium Floor Repair at Neshoba Central High School
Post-Bid
Philadelphia, MS 39350

Carpet Replacement
Results
Jackson, MS

Desoto County School District - Hope Sullivan Elementary and Southaven Middle School Flooring
Post-Bid
Southaven, MS 38671

Last Updated 09/29/2021 03:29 PM
Project Title

Repair Walls and Floors in Building One - 1967 Wing

Physical Address View project details and contacts
City, State (County) Oxford, MS 38655   (Lafayette County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall remove all flooring down to sub-flooring, abate all associated asbestos, paint all walls, doors, door frames, window frames, install new cove base and install new flooring system per the Project Objectives above. It is believed that the existing flooring is a composite of tile overlaid with linoleum. Existing tile and mastic are believed to be asbestos containing materials. The Contractor shall follow all local, state and federal laws for asbestos abatement. The Contractor is responsible for any permits related to the project. The Contractor shall transport and dispose of any material containing contaminants regulated by federal, state, or local regulation in accordance with federal, state, and local regulations.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents