Similar Projects
Habitat for Humanity Homes
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Macon, GA 31201

SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

Bethel Church Road Convenience Store with Fuel Pumps
New Construction, Infrastructure - 6,900 SF
Design
$1,500,000 CJ est. value
Lizella, GA 31052

CS 841 / N Highland Street From SR 38 / US 84 to Olegsby Ave-tia
Infrastructure
Design
$500,000 CJ est. value
Quitman, GA 31643

Construction of a Bridge and Approaches on US 441 Bus/SR 29 Bus
Demolition, New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Milledgeville, GA 31061

Pavement Marking Upgrades on I-75/SR 401
Infrastructure
Bidding
$900,000 CJ est. value
Macon, GA 31206

Installation of Cable Barriers at Various Locations on US 441/SR 15 in Banks
Infrastructure
Sub-Bidding
$4,000,000 CJ est. value
Baldwin, GA 30511

Buc-ee's #52 Car Wash - Union Grove Rd SE / Adairsville
New Construction, Infrastructure - 9,572 SF
Sub-Bidding
$6,000,000 CJ est. value
Adairsville, GA 30103

Max Fitness / Macon
New Construction, Infrastructure - 40,703 SF
Post-Bid
$12,000,000 CJ est. value
Macon, GA 31210

Rocky Creek WWTP Final Clarifier 5
Renovation
Post-Bid
$80,000 est. value
Macon, GA 31206

South Primary Clarifier Rebuild Wastewater Treatment Plant - Labor Only
Renovation
Results
Milledgeville, GA

Hudson River Water Reclamation Facility
New Construction, Infrastructure
Results
$23,047,512 CJ est. value
Homer, GA 30547

New Mission Road Elementary School
New Construction, Infrastructure - 102,635 SF
Construction
$30,000,000 CJ est. value
Cartersville, GA 30120

Dogwood Plaza / Adairsville
New Construction, Infrastructure - 7,260 SF
Construction
$1,500,000 CJ est. value
Adairsville, GA 30103

Forsyth Street Convenience Store and Gas Station
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Macon, GA 31201

Last Updated 07/18/2023 10:03 AM
Project Title

Modifications to the Water Pollution Control Plant

Physical Address View project details and contacts
City, State (County) Jasper, GA 30143   (Pickens County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $13,311,075 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 21, 2022, a general contractor has been given a tentative award. The project will not be officially awarded until funding has been approved. A timeline for funding approval has not been established. The Project consists of construction of: Modifications to existing grit structure, one aeration basin, modifications to existing aeration basin (Addition A-1), two final clarifiers, modifications to existing filters, new chlorine contact chamber, modifications to chemical feed system, sludge holding tank, modifications to existing pump stations, an effluent pump station, and modifications to existing control building, all complete with appurtenances Time allotted for construction is 480 consecutive calendar days for substantial completion and 540 days for final completion Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. Proposals for the complete work shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. Bid security shall be furnished in accordance with the Instructions to Bidders. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Sewage Treatment Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents