Similar Projects
Paving Projects - Golf-7 - County of Kenosha
Infrastructure
Conception
$390,000 CJ est. value
Kenosha, WI 53140

New Petrifying Springs Pavilion - Parks-17 - County of Kenosha
New Construction, Infrastructure
Conception
$800,000 CJ est. value
Kenosha, WI 53144

Sun Pointe Village - Phase 3 / Kenosha
New Construction, Infrastructure
Design
$9,000,000 CJ est. value
Kenosha, WI 53140

Horizon Park - PK-20-004 - City of Kenosha
New Construction, Infrastructure
Design
$1,648,000 CJ est. value
Kenosha, WI 53142

54 th Avenue & 56 th Avenue Resurfacing
Infrastructure
Post-Bid
$400,000 CJ est. value
Kenosha, WI 53140

Pleasant Prairie STH 165 Lakeview Force Main Repair - Rebid
Infrastructure
Post-Bid
$370,000 CJ est. value
Pleasant Prairie, WI 53158

Asbestos/Raze/Restore at Miscellaneous Sites
Infrastructure
Results
Kenosha, WI

Petrifying Springs Park Playground 4 Site Preparation
Infrastructure
Results
$600,000 est. value
Kenosha, WI 53144

Balcan Plastics Expansion
Addition, Build-Out - 215,000 SF
Construction
Pleasant Prairie, WI 53158

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

14th Avenue Apartments / Kenosha
New Construction, Infrastructure
Pending Verification
$16,500,000 CJ est. value
Kenosha, WI 53143

Darby Lane Farms Phase I / Somers
New Construction, Infrastructure - 773,764 SF
Pending Verification
$84,000,000 CJ est. value
Kenosha, WI 53144

16th Avenue Extension - TI-19-005 - City of Kenosha
Infrastructure
Conception
$1,500,000 CJ est. value
Kenosha, WI 53140

North Harbor Walkway - TI-20-002 - City of Kenosha
Infrastructure
Design
$970,250 CJ est. value
Kenosha, WI 53140

Construction of the Prairie Highlands Shared Use Path Project
Infrastructure
Post-Bid
$560,000 est. value
Pleasant Prairie, WI

Last Updated 07/10/2023 10:05 AM
Project Title

We Engeries Power Plant Redevelopment Logisticenter / Pleasant Prairie

Physical Address View project details and contacts
City, State (County) Pleasant Prairie, WI 53158   (Kenosha County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $226,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to demolish a former power plant, and to build a 2.2 million square foot industrial park. As of July 2023, the project is in design and the land acquisition phase has been completed. The project requires funding. Infrastructure work will begin in the third quarter of 2023. Information regarding how and when a general contractor will be selected has not yet been confirmed. A firm timeline for construction has not been confirmed.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2,200,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents