Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

New Intracoastal Waterway Bridge - City of Orange Beach
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Orange Beach, AL 36542

SR 59 Capacity Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Gulf Shores, AL 36542

SR 59 Capacity Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Gulf Shores, AL 36542

Effluent Outfall Upgrades USDA Rural Development
Post-Bid
Loxley, AL 36551

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Construction Pipe and Culvert Procurement
Results
Foley, AL

Gulf of Mexico Artificial Reef Construction Project
Results
Gulf Shores, AL

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Aldi / Daphne
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Daphne, AL 36526

Live Oak Estates
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

RFQ Design - Gulf Coast Engineering Research Station - New Building
New Construction, Infrastructure
Bidding
$7,600,000 CJ est. value
Orange Beach, AL 36561

Canal Road Widening Water Main Relocation (SR-161 to Wilson Boulevard)
Infrastructure
Post-Bid
Orange Beach, AL 36561

Last Updated 09/22/2022 04:39 PM
Project Title

Drainage Improvements at North Main Street at Fire Station No. 2

Physical Address View project details and contacts
City, State (County) Daphne, AL 36526   (Baldwin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,056,252 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 22, 2022, project was awarded to McElhenney Construction, awarded amount is $1,056,252.14. The Work will consist of: Remove & replace +-575 LF concrete ditch, install 40 LF of 6'x8' box culvert & 195 LF of 102"x63" arched pipe. one hundred eighty (180) calendar days will be allowed for the completion of the Project. All Bids must be on blank forms provided in the Specifications and submitted in its entirety. A cashier's check drawn on an Alabama bank or a Bidder's bond, payable to City of Daphne, Alabama, for an amount not less than five percent (5%) of the amount bid, but in no event more than ten thousand dollars ($10,000), shall be filed with the Bid. The Bidder's bond shall be prepared on the form specified and signed by a bonding company authorized to do business in the State of Alabama. A performance bond in the form and terms approved by the City in an amount not less than the contract price will be required at the signing of the Agreement. A labor and materials bond in the form and terms approved by the City in an amount not less than the Contract Price insuring payment for all labor and materials shall also be required at the signing of the Agreement. In addition, the Contractor must furnish to the City at the time of the signing of the Agreement a certificate of insurance coverage as provided in the Contract Documents. The City reserves the right to reject any and/or all Bids and to waive informalities and to furnish any item of material or work to change the amount of the Contract Price. Liquidated damages for non-completion of the Work within the Contract Times will be assessed in accordance with the terms of the Contract. Bids are invited from all qualified respondents. The City is an Equal Opportunity Employer. All minority business enterprises (MBE) and disadvantaged business enterprises (DBE) will be taken into consideration. If the. Contract is to be awarded, the City will award the Contract to the lowest responsive and responsible Bidder. No Bid shall be withdrawn for a period of sixty (60) days subsequent to the opening of Bids without the consent of the City Council of City of Daphne, Alabama. The City may disqualify Bidders that have had prior demands placed on a bid bond, payment bond, or performance bond within the last five (5) years prior to the date of this Bid submission.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents