Similar Projects
US 730/5.2 Miles N of Oregon Border - Rockfall Prevention
Alteration
Design
$1,063,000 est. value
Benton City, WA

I-82/SR 14 Interchange - Plymouth Weigh Station Improvements
Infrastructure
Design
$8,423,000 CJ est. value
Plymouth, WA 99346

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Chiawana Richland Ranch Dam Decommissioning
Demolition, Infrastructure
Sub-Bidding
$485,000 CJ est. value
Richland, WA 99352

2022 Pavement Marking
Infrastructure
Sub-Bidding
$65,000 CJ est. value
Prosser, WA 99350

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Torbett and McPherson Watermain Replacement and Road Improvements
Infrastructure
Results
$2,250,000 to $2,500,000 est. value
Richland, WA 99354

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

X-Energy Reactor Nuclear Plant - Tri-Energy Partnership
New Construction, Infrastructure
Pending Verification
$2,400,000,000 CJ est. value
Richland, WA 99352

X-Energy Reactor Nuclear Plant - Tri-Energy Partnership
New Construction, Infrastructure
Pending Verification
$2,400,000,000 CJ est. value
Richland, WA 99352

US 395/Pioneer Memorial Bridge - Bridge Painting Stage 2
Renovation, Infrastructure
Design
$30,835,000 CJ est. value
Kennewick, WA 99338

W. 6th Ave Sidewalk (CDBG)
Infrastructure
Bidding
$250,000 CJ est. value
Kennewick, WA 99336

Prosser Memorial Health Replacement Hospital - BP-01 Earthwork and Site Utilities
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Prosser, WA 99350

Last Updated 08/11/2022 12:04 PM
Project Title

2022 Main Turbine Crane Bridge and Trolley Upgrades

Physical Address View project details and contacts
City, State (County) Kennewick, WA 99336   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For the Main Turbine Crane Bridge and Trolley Upgrades as more fully described in Invitation for Bid (IFB) No. 705595. All Bids shall be subject to and shall comply with IFB Documents. All MT-CRA-1 Work will be completed by January 20, 2023

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 11 - Equipment.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents