Similar Projects
Multi-Family Development
New Construction
Conception
Las Vegas, NV 89119

Mixed Use Apartments
New Construction - 15,520 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Las Vegas, NV 89183

Bleutech Park Las Vegas
New Construction
Design
$7,500,000,000 est. value
Las Vegas, NV

Bleutech Park Las Vegas
New Construction
Design
$7,500,000,000 est. value
Las Vegas, NV

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

Chip Seal
Infrastructure
Results
$620,000 to $745,000 est. value
NV

Lamb Boulevard Centennial Parkway
Infrastructure
Results
$9,500,000 to $11,000,000 est. value
North Las Vegas, NV 89115

Touro University Parking Expansion Phase II
New Construction
Construction
Henderson, NV 89014

Boulder and Galleria
New Construction - 57,600 SF
Construction
$10,000,000 CJ est. value
Henderson, NV 89011

Boulder Lodge Expansion
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$9,600,000 CJ est. value
Henderson, NV 89015

Dream Hotel Las Vegas
New Construction, Infrastructure - 27,000 SF
Pending Verification
$545,000,000 CJ est. value
Las Vegas, NV 89119

Bonanza and First Mixed-Use
New Construction - 13,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Las Vegas, NV 89101

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Last Updated 02/09/2023 03:08 PM
Project Title

Henderson Star

Physical Address View project details and contacts
City, State (County) Henderson, NV 89011   (Clark County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Schematic Drawings, Construction start expected February 2025
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 213 unit multi-family development. As of February 9, 2023, this project is in the entitlements phase. It went before the Planning Commission on October 13, 2022 for design review. A general contractor has not been chosen, and the method of contractor selection has not been determined. A firm timeline has not been confirmed.

Details

,, 413,829 SF - 3 Stories Above Grade, 342,070 SF. 2 Stories Above Grade, 9,469 SF. 4 Stories Below Grade, 62,290 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents