Similar Projects
Storm Drain Lining at Federal Courthouse
Term Contract
Design
$25,000 to $100,000 est. value
Fargo, ND 58102

Fargo Moorhead Metropolitan Area Flood Risk Management Project
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Fargo, ND

New Paving and Utility Construction
Infrastructure
Bidding
$15,878,584 CJ est. value
Fargo, ND 58102

New Paving and Utility Construction
Infrastructure
Bidding
$15,878,584 CJ est. value
Fargo, ND 58102

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Fargo-Moorhead Metropolitan (FMM) Area Flood Risk Management Project - Drain 27 - Sources Sought
Post-Bid
$5,000,000 to $10,000,000 est. value
Fargo, ND

Paving and Utility Rehabilitation/Reconstruction Improvement
Results
$1,061,001 est. value
Fargo, ND 58102

Oak Grove Flood Risk Management
Results
$7,518,681 est. value
Fargo, ND

Sports Complex - Fargo Park District
New Construction, Infrastructure
Construction
$77,000,000 CJ est. value
Fargo, ND 58104

Interstate 94 / Fire Station - City Of West Fargo
New Construction, Infrastructure - 30,000 SF
Pending Verification
$10,000,000 CJ est. value
West Fargo, ND 58078

Main Avenue Commercial Development
New Construction, Build-out, Infrastructure
Pending Verification
$7,100,000 CJ est. value
Fargo, ND 58103

41st Retail Development / Fargo
New Construction, Infrastructure
Design
$3,885,000 CJ est. value
Fargo, ND 58104

Sewer Storm, and Street Improvement District 2022-10 (Chestnut and Ironwood Drive Rehabilitation)
Infrastructure
Bidding
$1,200,000 CJ est. value
Horace, ND 58047

2021 FM Diversion Pipeline Improvements Phase 1
Infrastructure
Post-Bid
Kindred, ND

Riverwood Flood Risk Management
Results
$3,196,053 est. value
Fargo, ND

Last Updated 08/27/2022 10:31 AM
Project Title

Sewer Improvement District No. 2022-1 Lagoon Improvements

Physical Address View project details and contacts
City, State (County) Tower City, ND 58071   (Cass County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $375,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Removal of existing rip rap, excavation, repair of lagoon cell walls, installation of new rip rap, gate valve replacements, and miscellaneous construction items. Est. Value Notes: Base Bid: $375,000. Scope: Preparatory work and operations including a. Movement of personnel, equipment, and supplies. b. Establishment of temporary facilities. c. All other work and operations that must be performed, or costs incurred, before beginning work on the project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents