Similar Projects
Last Updated | 04/07/2023 02:07 PM |
Project Title | JMA Dome Seating and Building Systems Improvements / Syracuse |
Physical Address | View project details and contacts |
City, State (County) | Syracuse, NY 13210 (Onondaga County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Stadium |
Contracting Method | Bids by Invitation |
Project Status | Sub-Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $18,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Hayner Hoyt Corporation has been selected as the Construction Manager for the JMA Dome Seating and Building Systems Improvements Syracuse University 1 Campus Drive Syracuse NY 13244. This project is being bid for construction and we are soliciting quotes from all Trades. The Project consists of renovations to the seating. Scopes of work include: Limited site work, selective demolition, concrete, Rebar, masonry, misc. steel, waterproofing, Metal roofing, insulated metal wall panel, fireproofing, doors/frames/hardware, aluminum windows, framing/drywall/ceilings, epoxy flooring, painting, sprinkler, Plumbing, HVAC, fire alarm, smoke management and electrical. A. Bidders must comply with all Bidding Qualifications identified in the Instruction to Bidders and all Division 01 General Requirements. All Bidders must acknowledge this in their Bid Form. Bids for these Bid Packages are due Tuesday 4/07/2023 at 2:00 PM. Bids are to be sent electronically to Tim Donovan tdonovan@haynerhoyt.com or via fax 315-454-8204, before 2:00 pm on the bid due date. Any bids delivered after 2:00 pm or not on the proper bid form will be disqualified. The Bid Packages consist of: 1. Demolition 2. Sitework 3. Concrete 4. Structural Steel & Metal Fabrications 5. Waterproofing 6. Insulated Metal Roofing Panels 7. Insulated Metal Wall Panels 8. Doors, Frames & Hardware (Supply Only) 9. Coiling Counter Fire Shutter 10. Framing, Drywall & Ceilings 11. Epoxy/Resinous Floor 12. Painting 13. Fire Suppression 14. Plumbing 15. HVAC 16. Electrical 17. Fire Alarm 18. Smoke Control System B. Questions for the bid packages are to be directed to Tim Donovan. Last day for bid questions will be Wednesday 3/27/2023 by 12:00 pm. DO NOT CONTACT ANY DESIGN PROFESSIONALS OR THE OWNER DIRECTLY, all questions must be sent through The Hayner Hoyt Corporation in RFI Format. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |