Similar Projects
Marshall Construct Welding Technology Facility - Texas State Technical College
New Construction, Infrastructure
Conception
$15,300,000 CJ est. value
Marshall, TX 75672

American Cementing - Bulk Plant / Building Expansion
Addition, Demolition, Infrastructure - 9,375 SF
Design
$700,000 CJ est. value
Marshall, TX 75672

Mulberry Springs Baptist Church New Sanctuary
New Construction, Infrastructure - 19,800 SF
Design
$3,000,000 CJ est. value
Hallsville, TX 75650

Baseball Field Parking Lot Expansion
Infrastructure
Bidding
$1,272,000 CJ est. value
Hallsville, TX 75650

Baseball Field Parking Lot Expansion
Infrastructure
Bidding
$1,272,000 CJ est. value
Hallsville, TX 75650

Jack C. Hays HS - Bleachers
Renovation
Post-Bid

New Marshall Early Childhood Center (MECC) Renovations
Renovation
Post-Bid
Marshall, TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Downtown Redevelopment, Phase I
Infrastructure
Results
$464,000 est. value
Marshall, TX 75672

QuikTrip #7906 / Marshall
New Construction, Infrastructure - 8,292 SF
Construction
$1,000,000 CJ est. value
Marshall, TX 75672

QuikTrip #7906 / Marshall
New Construction, Infrastructure - 8,292 SF
Construction
$1,000,000 CJ est. value
Marshall, TX 75672

2023 Bond - Marshall Independent School District
Renovation
Design
$41,900,000 CJ est. value
Marshall, TX 75670

Marshall Readiness Center Sanitary Sewer
Infrastructure
Post-Bid
$350,000 CJ est. value
Marshall, TX 75672

IH 20 - Hazard Elimination and Safety
Infrastructure
Results
$10,951,753 est. value
TX

Joe Pine Coffee
New Construction, Infrastructure - 3,705 SF
Design
$1,500,000 CJ est. value
Marshall, TX 75670

Last Updated 03/27/2023 05:06 PM
Project Title

Marshall Christian Academy Campus

Physical Address View project details and contacts
City, State (County) Marshall, TX 75672   (Harrison County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Stadium
Contracting Method Bids by Invitation
Project Status Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new school campus in phases. Phase 1 includes the multi-purpose building and parking for 110 vehicles, Phase 2 includes a classroom building and recreation areas. Phase 3 may include a football field in the future. The uses that are allowed at the site include: Church - Academic Classes & Offices - Commercial Parking Lots - Recreation facilities Academy Managed and School Cafeteria. As of March 27, 2023, the project is in planning. The owner is in the processes of raising funds for the project. No development plans or building permits have been submitted into the City of Marshall. Information regarding the architect and general contractor have not been disclosed. A firm construction timeline has not been set; however, construction is not expected to begin prior to summer 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Parking Spaces, 110 Parking Spaces.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents