Similar Projects
Alpine School District Central Elementary School Rebuild
Renovation - 70,000 SF
Post-Bid
Less than $15,000,000 est. value
Pleasant Grove, UT

Alpine School District Cascade Elementary School Rebuild
Renovation - 70,000 SF
Post-Bid
Less than $15,000,000 est. value
Orem, UT

Greenwood Elementary School
Renovation
Results
American Fork, UT

Amelia Earhart Elementary Improvement Project
Results
Less than $500,000 est. value
Provo, UT 84601

Eagle Mountain UT SR Seminary
Renovation - 40,811 SF
Construction
Eagle Mountain, UT

Valley View Middle School
Construction
Salem, UT

Alpine School District Administration Additions for Aspen/Bonneville Elementary
Renovation, Addition
Post-Bid
Highland, UT

Lakeridge Junior High Science Classroom Remodel
Renovation
Results
Less than $87,000 est. value
Orem, UT 84058

CM/GC for New Elementary School
- 80,000 SF
Construction
Less than $18,000,000 est. value
Saratoga Springs, UT

Maple Grove Middle School
New Construction
Post-Bid
Mapleton, UT 84664

Construction Manager/General Contractor Spanish Fork High School Rebuild
Results
Spanish Fork, UT 84660

Construction of the Cascade Elementary School
Construction
Orem, UT

CM/GC for 206 New Elementary School
New Construction
Post-Bid
$19,000,000 est. value
Vineyard, UT 84059

Mountain View High School Shop Remodel
Renovation
Results
Orem, UT 84057

General Contractor Technology/Curriculum Building
New Construction
Construction
Spanish Fork, UT

Last Updated 05/28/2020 06:38 PM
Project Title

Franklin Discovery Academy - Construction of New Classroom Addition

Physical Address View project details and contacts
City, State (County) Vineyard, UT   (Utah County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description General Contractors for the construction of a classroom addition to its existing facility at 320 E Gammon. The addition will be approximately 1,200 square feet and sit on the second floor of the northwest corner of the facility. Franklin Discovery Academy will use proceeds from a recent bond issue for financing the addition costs. The addition will include the following rooms: 2 classrooms (1 approximately 600 square feet, 1 approximately 450 square feet, a bathroom (50 sq feet), low stimulus room (50 sq feet), and storage room (50 square feet). The addition will be built over the existing roof. It is expected that a height difference will require a ramp 10-15 feet long. It is also expected that to facilitate the ramp, an existing classroom door may have to be moved. Bids must be inclusive of all costs. Construction must match the design and quality of the existing building
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents