Similar Projects
Owners Project Manager
Term Contract
Bidding
$3,000,000 to $5,000,000 est. value
Boston, MA

Machine Shop At Conley Terminal
Alteration
Bidding
Boston, MA 02127

Burnham Boiler
Post-Bid
Less than $25,000 est. value
Walpole, MA

RTU Replacement and Associated Work
Post-Bid
Less than $350,000 est. value
Wellesley, MA 02481

Pump Station Duct Cleaning and Repairs
Results
$468,000 est. value
Hingham, Quincy, MA 02043

2020 Pump Station Improvements Project - Filed Sub Bids
Results
$1,250,000 est. value
Weymouth, MA

Campus Police and Admissions Renovations - Filed Sub Bids
Post-Bid
Less than $500,000 est. value
Wellesley, MA 02481

Natatorium HVAC Renovations at Dedham Pool Building - General Bid
Results
Less than $700,000 est. value
Dedham, MA

Replacement of Boilers and Hot Water Tanks at Augustine Silva House
Post-Bid
Less than $25,000 est. value
Stoughton, MA 02072

Removal and Replacement of 7 Section Heating Unit
Results
Braintree, MA

Air Vent Cleaning of Aviation Hangars
Post-Bid

Boiler Room Renovations
Results
$225,000 est. value
Braintree, MA 02184

HVAC and Mechanical Products
Term Contract
Post-Bid

Sprague School Chiller Replacement Project - General Bids
Results
$997,330 est. value
Wellesley, MA 02482

Provide HVAC Repair Services for the Boston Police Department
Post-Bid
$150,000 est. value
Boston, MA

Reported 02/04/2022 12:00 AM
Project Title

Furnace Replacement - General Bid

Physical Address View project details and contacts
City, State (County) Franklin, MA 02038   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $258,000
Plans Available from Copy Center - 01/05/22
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required. The Replacement of oil fired furnaces with new VRF Systems serving Heating and Cooling, in Franklin, Massachusetts. The Project consists of Removal and replacement of existing oil fired furnaces with new ducted VRF indoor air handling unit and wall mounted VRF indoor units in selected residential units. Goal SOMWBA is 13%

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents