Similar Projects
Air Handler Maintenance
Bidding
Columbus, OH

HVAC Supplies
Bidding
Columbus, OH

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Emergency Power & HVAC, DFAS
Post-Bid
$500,000 to $1,000,000 est. value
Columbus, OH

HVAC Replacements Phase 2 - CM at Risk Contract
Results
Less than $7,216,087 est. value
Columbus, OH

HVAC Repair and Replacements Project
Results
Less than $7,275,000 est. value
Columbus, OH

HVAC Controls and Repair Parts
Bidding
Columbus, OH

DPU/Watershed/HVAC Service
Post-Bid
Less than $10,000 est. value
Columbus, OH

Cooling Tower Replacement
Results
Less than $134,894 est. value
Upper Arlington, OH

HVAC Repairs
Bidding
Columbus, OH

PROJECT NLZG182004; Replace AHU's at Building 883
Post-Bid
$100,000 to $250,000 est. value
Columbus, OH 43217

Design-Build Services - Renovation of HVAC Systems
Results
Less than $101,213 est. value
Columbus, OH

Public Service Facilities Mechanical Repair
Post-Bid
Columbus, OH 43215

HVAC Repair and Maintenance UTC
Term Contract
Results
Columbus, OH

HVAC Filters
Post-Bid
Columbus, OH 43215

Last Updated 01/29/2019 02:57 PM
Project Title

Morehouse Pavilion AHU1 Replacement - Design-Build

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,216,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Ohio State University Wexner Medical Center Martha Morehouse Medical Plaza Pavilion building is served in large part by AHU-1. This dual duct unit consists of a 150,000 CFM cold deck, 100,000 CFM hot deck and a 150,000 CFM return section. The hot and cold deck fans serve constant volume dual duct terminal units. The unit has documented system performance issues including supply air shortages, hot deck ventilation and a poor mixing. The University is seeking qualifications to replace the cold deck, hot deck and return fans as well as replacing components in the mixing section to improve same. Controls shall be upgraded from existing pneumatic system to DDC.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents